KGantt::Legend

Search for usage in LXR

#include <KGanttLegend>

Inheritance diagram for KGantt::Legend:

Public Member Functions

 Legend (QWidget *parent=nullptr)
 
 ~Legend () override
 
QModelIndex indexAt (const QPoint &point) const override
 
QSize minimumSizeHint () const override
 
void scrollTo (const QModelIndex &, ScrollHint=EnsureVisible) override
 
void setModel (QAbstractItemModel *model) override
 
QSize sizeHint () const override
 
QRect visualRect (const QModelIndex &index) const override
 
- Public Member Functions inherited from QAbstractItemView
 QAbstractItemView (QWidget *parent)
 
void activated (const QModelIndex &index)
 
bool alternatingRowColors () const const
 
int autoScrollMargin () const const
 
void clearSelection ()
 
void clicked (const QModelIndex &index)
 
void closePersistentEditor (const QModelIndex &index)
 
QModelIndex currentIndex () const const
 
Qt::DropAction defaultDropAction () const const
 
void doubleClicked (const QModelIndex &index)
 
DragDropMode dragDropMode () const const
 
bool dragDropOverwriteMode () const const
 
bool dragEnabled () const const
 
void edit (const QModelIndex &index)
 
EditTriggers editTriggers () const const
 
void entered (const QModelIndex &index)
 
bool hasAutoScroll () const const
 
ScrollMode horizontalScrollMode () const const
 
QSize iconSize () const const
 
void iconSizeChanged (const QSize &size)
 
QWidget * indexWidget (const QModelIndex &index) const const
 
virtual QVariant inputMethodQuery (Qt::InputMethodQuery query) const const override
 
bool isPersistentEditorOpen (const QModelIndex &index) const const
 
QAbstractItemDelegate * itemDelegate () const const
 
QAbstractItemDelegate * itemDelegate (const QModelIndex &index) const const
 
QAbstractItemDelegate * itemDelegateForColumn (int column) const const
 
virtual QAbstractItemDelegate * itemDelegateForIndex (const QModelIndex &index) const const
 
QAbstractItemDelegate * itemDelegateForRow (int row) const const
 
virtual void keyboardSearch (const QString &search)
 
QAbstractItemModel * model () const const
 
void openPersistentEditor (const QModelIndex &index)
 
void pressed (const QModelIndex &index)
 
virtual void reset ()
 
void resetHorizontalScrollMode ()
 
void resetVerticalScrollMode ()
 
QModelIndex rootIndex () const const
 
void scrollToBottom ()
 
void scrollToTop ()
 
virtual void selectAll ()
 
QAbstractItemView::SelectionBehavior selectionBehavior () const const
 
QAbstractItemView::SelectionMode selectionMode () const const
 
QItemSelectionModel * selectionModel () const const
 
void setAlternatingRowColors (bool enable)
 
void setAutoScroll (bool enable)
 
void setAutoScrollMargin (int margin)
 
void setCurrentIndex (const QModelIndex &index)
 
void setDefaultDropAction (Qt::DropAction dropAction)
 
void setDragDropMode (DragDropMode behavior)
 
void setDragDropOverwriteMode (bool overwrite)
 
void setDragEnabled (bool enable)
 
void setDropIndicatorShown (bool enable)
 
void setEditTriggers (EditTriggers triggers)
 
void setHorizontalScrollMode (ScrollMode mode)
 
void setIconSize (const QSize &size)
 
void setIndexWidget (const QModelIndex &index, QWidget *widget)
 
void setItemDelegate (QAbstractItemDelegate *delegate)
 
void setItemDelegateForColumn (int column, QAbstractItemDelegate *delegate)
 
void setItemDelegateForRow (int row, QAbstractItemDelegate *delegate)
 
virtual void setRootIndex (const QModelIndex &index)
 
void setSelectionBehavior (QAbstractItemView::SelectionBehavior behavior)
 
void setSelectionMode (QAbstractItemView::SelectionMode mode)
 
virtual void setSelectionModel (QItemSelectionModel *selectionModel)
 
void setTabKeyNavigation (bool enable)
 
void setTextElideMode (Qt::TextElideMode mode)
 
void setVerticalScrollMode (ScrollMode mode)
 
bool showDropIndicator () const const
 
virtual int sizeHintForColumn (int column) const const
 
QSize sizeHintForIndex (const QModelIndex &index) const const
 
virtual int sizeHintForRow (int row) const const
 
bool tabKeyNavigation () const const
 
Qt::TextElideMode textElideMode () const const
 
void update (const QModelIndex &index)
 
ScrollMode verticalScrollMode () const const
 
void viewportEntered ()
 
- Public Member Functions inherited from QAbstractScrollArea
 QAbstractScrollArea (QWidget *parent)
 
void addScrollBarWidget (QWidget *widget, Qt::Alignment alignment)
 
QWidget * cornerWidget () const const
 
QScrollBar * horizontalScrollBar () const const
 
Qt::ScrollBarPolicy horizontalScrollBarPolicy () const const
 
QSize maximumViewportSize () const const
 
QWidgetList scrollBarWidgets (Qt::Alignment alignment)
 
void setCornerWidget (QWidget *widget)
 
void setHorizontalScrollBar (QScrollBar *scrollBar)
 
void setHorizontalScrollBarPolicy (Qt::ScrollBarPolicy)
 
void setSizeAdjustPolicy (SizeAdjustPolicy policy)
 
virtual void setupViewport (QWidget *viewport)
 
void setVerticalScrollBar (QScrollBar *scrollBar)
 
void setVerticalScrollBarPolicy (Qt::ScrollBarPolicy)
 
void setViewport (QWidget *widget)
 
SizeAdjustPolicy sizeAdjustPolicy () const const
 
QScrollBar * verticalScrollBar () const const
 
Qt::ScrollBarPolicy verticalScrollBarPolicy () const const
 
QWidget * viewport () const const
 
- Public Member Functions inherited from QFrame
 QFrame (QWidget *parent, Qt::WindowFlags f)
 
QRect frameRect () const const
 
Shadow frameShadow () const const
 
Shape frameShape () const const
 
int frameStyle () const const
 
int frameWidth () const const
 
int lineWidth () const const
 
int midLineWidth () const const
 
void setFrameRect (const QRect &)
 
void setFrameShadow (Shadow)
 
void setFrameShape (Shape)
 
void setFrameStyle (int style)
 
void setLineWidth (int)
 
void setMidLineWidth (int)
 
- Public Member Functions inherited from QWidget
 QWidget (QWidget *parent, Qt::WindowFlags f)
 
bool acceptDrops () const const
 
QString accessibleDescription () const const
 
QString accessibleName () const const
 
QList< QAction * > actions () const const
 
void activateWindow ()
 
QAction * addAction (const QIcon &icon, const QString &text)
 
QAction * addAction (const QIcon &icon, const QString &text, Args &&... args)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, Args &&... args)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QIcon &icon, const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QString &text)
 
QAction * addAction (const QString &text, Args &&... args)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut, Args &&... args)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
void addAction (QAction *action)
 
void addActions (const QList< QAction * > &actions)
 
void adjustSize ()
 
bool autoFillBackground () const const
 
QPalette::ColorRole backgroundRole () const const
 
QBackingStore * backingStore () const const
 
QSize baseSize () const const
 
QWidget * childAt (const QPoint &p) const const
 
QWidget * childAt (int x, int y) const const
 
QRect childrenRect () const const
 
QRegion childrenRegion () const const
 
void clearFocus ()
 
void clearMask ()
 
bool close ()
 
QMargins contentsMargins () const const
 
QRect contentsRect () const const
 
Qt::ContextMenuPolicy contextMenuPolicy () const const
 
QCursor cursor () const const
 
void customContextMenuRequested (const QPoint &pos)
 
WId effectiveWinId () const const
 
void ensurePolished () const const
 
Qt::FocusPolicy focusPolicy () const const
 
QWidget * focusProxy () const const
 
QWidget * focusWidget () const const
 
const QFont & font () const const
 
QFontInfo fontInfo () const const
 
QFontMetrics fontMetrics () const const
 
QPalette::ColorRole foregroundRole () const const
 
QRect frameGeometry () const const
 
QSize frameSize () const const
 
const QRect & geometry () const const
 
QPixmap grab (const QRect &rectangle)
 
void grabGesture (Qt::GestureType gesture, Qt::GestureFlags flags)
 
void grabKeyboard ()
 
void grabMouse ()
 
void grabMouse (const QCursor &cursor)
 
int grabShortcut (const QKeySequence &key, Qt::ShortcutContext context)
 
QGraphicsEffect * graphicsEffect () const const
 
QGraphicsProxyWidget * graphicsProxyWidget () const const
 
bool hasEditFocus () const const
 
bool hasFocus () const const
 
virtual bool hasHeightForWidth () const const
 
bool hasMouseTracking () const const
 
bool hasTabletTracking () const const
 
int height () const const
 
virtual int heightForWidth (int w) const const
 
void hide ()
 
Qt::InputMethodHints inputMethodHints () const const
 
void insertAction (QAction *before, QAction *action)
 
void insertActions (QAction *before, const QList< QAction * > &actions)
 
bool isActiveWindow () const const
 
bool isAncestorOf (const QWidget *child) const const
 
bool isEnabled () const const
 
bool isEnabledTo (const QWidget *ancestor) const const
 
bool isFullScreen () const const
 
bool isHidden () const const
 
bool isMaximized () const const
 
bool isMinimized () const const
 
bool isModal () const const
 
bool isTopLevel () const const
 
bool isVisible () const const
 
bool isVisibleTo (const QWidget *ancestor) const const
 
bool isWindow () const const
 
bool isWindowModified () const const
 
QLayout * layout () const const
 
Qt::LayoutDirection layoutDirection () const const
 
QLocale locale () const const
 
void lower ()
 
QPoint mapFrom (const QWidget *parent, const QPoint &pos) const const
 
QPointF mapFrom (const QWidget *parent, const QPointF &pos) const const
 
QPoint mapFromGlobal (const QPoint &pos) const const
 
QPointF mapFromGlobal (const QPointF &pos) const const
 
QPoint mapFromParent (const QPoint &pos) const const
 
QPointF mapFromParent (const QPointF &pos) const const
 
QPoint mapTo (const QWidget *parent, const QPoint &pos) const const
 
QPointF mapTo (const QWidget *parent, const QPointF &pos) const const
 
QPoint mapToGlobal (const QPoint &pos) const const
 
QPointF mapToGlobal (const QPointF &pos) const const
 
QPoint mapToParent (const QPoint &pos) const const
 
QPointF mapToParent (const QPointF &pos) const const
 
QRegion mask () const const
 
int maximumHeight () const const
 
QSize maximumSize () const const
 
int maximumWidth () const const
 
int minimumHeight () const const
 
QSize minimumSize () const const
 
int minimumWidth () const const
 
void move (const QPoint &)
 
void move (int x, int y)
 
QWidget * nativeParentWidget () const const
 
QWidget * nextInFocusChain () const const
 
QRect normalGeometry () const const
 
void overrideWindowFlags (Qt::WindowFlags flags)
 
virtual QPaintEngine * paintEngine () const const override
 
const QPalette & palette () const const
 
QWidget * parentWidget () const const
 
QPoint pos () const const
 
QWidget * previousInFocusChain () const const
 
 QWIDGETSIZE_MAX QWIDGETSIZE_MAX
 
void raise ()
 
QRect rect () const const
 
void releaseKeyboard ()
 
void releaseMouse ()
 
void releaseShortcut (int id)
 
void removeAction (QAction *action)
 
void render (QPaintDevice *target, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags)
 
void render (QPainter *painter, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags)
 
void repaint ()
 
void repaint (const QRect &rect)
 
void repaint (const QRegion &rgn)
 
void repaint (int x, int y, int w, int h)
 
void resize (const QSize &)
 
void resize (int w, int h)
 
bool restoreGeometry (const QByteArray &geometry)
 
QByteArray saveGeometry () const const
 
QScreen * screen () const const
 
void scroll (int dx, int dy)
 
void scroll (int dx, int dy, const QRect &r)
 
void setAcceptDrops (bool on)
 
void setAccessibleDescription (const QString &description)
 
void setAccessibleName (const QString &name)
 
void setAttribute (Qt::WidgetAttribute attribute, bool on)
 
void setAutoFillBackground (bool enabled)
 
void setBackgroundRole (QPalette::ColorRole role)
 
void setBaseSize (const QSize &)
 
void setBaseSize (int basew, int baseh)
 
void setContentsMargins (const QMargins &margins)
 
void setContentsMargins (int left, int top, int right, int bottom)
 
void setContextMenuPolicy (Qt::ContextMenuPolicy policy)
 
void setCursor (const QCursor &)
 
void setDisabled (bool disable)
 
void setEditFocus (bool enable)
 
void setEnabled (bool)
 
void setFixedHeight (int h)
 
void setFixedSize (const QSize &s)
 
void setFixedSize (int w, int h)
 
void setFixedWidth (int w)
 
void setFocus ()
 
void setFocus (Qt::FocusReason reason)
 
void setFocusPolicy (Qt::FocusPolicy policy)
 
void setFocusProxy (QWidget *w)
 
void setFont (const QFont &)
 
void setForegroundRole (QPalette::ColorRole role)
 
void setGeometry (const QRect &)
 
void setGeometry (int x, int y, int w, int h)
 
void setGraphicsEffect (QGraphicsEffect *effect)
 
void setHidden (bool hidden)
 
void setInputMethodHints (Qt::InputMethodHints hints)
 
void setLayout (QLayout *layout)
 
void setLayoutDirection (Qt::LayoutDirection direction)
 
void setLocale (const QLocale &locale)
 
void setMask (const QBitmap &bitmap)
 
void setMask (const QRegion &region)
 
void setMaximumHeight (int maxh)
 
void setMaximumSize (const QSize &)
 
void setMaximumSize (int maxw, int maxh)
 
void setMaximumWidth (int maxw)
 
void setMinimumHeight (int minh)
 
void setMinimumSize (const QSize &)
 
void setMinimumSize (int minw, int minh)
 
void setMinimumWidth (int minw)
 
void setMouseTracking (bool enable)
 
void setPalette (const QPalette &)
 
void setParent (QWidget *parent)
 
void setParent (QWidget *parent, Qt::WindowFlags f)
 
void setScreen (QScreen *screen)
 
void setShortcutAutoRepeat (int id, bool enable)
 
void setShortcutEnabled (int id, bool enable)
 
void setSizeIncrement (const QSize &)
 
void setSizeIncrement (int w, int h)
 
void setSizePolicy (QSizePolicy)
 
void setSizePolicy (QSizePolicy::Policy horizontal, QSizePolicy::Policy vertical)
 
void setStatusTip (const QString &)
 
void setStyle (QStyle *style)
 
void setStyleSheet (const QString &styleSheet)
 
void setTabletTracking (bool enable)
 
void setToolTip (const QString &)
 
void setToolTipDuration (int msec)
 
void setUpdatesEnabled (bool enable)
 
void setupUi (QWidget *widget)
 
virtual void setVisible (bool visible)
 
void setWhatsThis (const QString &)
 
void setWindowFilePath (const QString &filePath)
 
void setWindowFlag (Qt::WindowType flag, bool on)
 
void setWindowFlags (Qt::WindowFlags type)
 
void setWindowIcon (const QIcon &icon)
 
void setWindowIconText (const QString &)
 
void setWindowModality (Qt::WindowModality windowModality)
 
void setWindowModified (bool)
 
void setWindowOpacity (qreal level)
 
void setWindowRole (const QString &role)
 
void setWindowState (Qt::WindowStates windowState)
 
void setWindowTitle (const QString &)
 
void show ()
 
void showFullScreen ()
 
void showMaximized ()
 
void showMinimized ()
 
void showNormal ()
 
QSize size () const const
 
QSize sizeIncrement () const const
 
QSizePolicy sizePolicy () const const
 
void stackUnder (QWidget *w)
 
QString statusTip () const const
 
QStyle * style () const const
 
QString styleSheet () const const
 
bool testAttribute (Qt::WidgetAttribute attribute) const const
 
QString toolTip () const const
 
int toolTipDuration () const const
 
QWidget * topLevelWidget () const const
 
bool underMouse () const const
 
void ungrabGesture (Qt::GestureType gesture)
 
void unsetCursor ()
 
void unsetLayoutDirection ()
 
void unsetLocale ()
 
void update ()
 
void update (const QRect &rect)
 
void update (const QRegion &rgn)
 
void update (int x, int y, int w, int h)
 
void updateGeometry ()
 
bool updatesEnabled () const const
 
QRegion visibleRegion () const const
 
QString whatsThis () const const
 
int width () const const
 
QWidget * window () const const
 
QString windowFilePath () const const
 
Qt::WindowFlags windowFlags () const const
 
QWindow * windowHandle () const const
 
QIcon windowIcon () const const
 
void windowIconChanged (const QIcon &icon)
 
QString windowIconText () const const
 
void windowIconTextChanged (const QString &iconText)
 
Qt::WindowModality windowModality () const const
 
qreal windowOpacity () const const
 
QString windowRole () const const
 
Qt::WindowStates windowState () const const
 
QString windowTitle () const const
 
void windowTitleChanged (const QString &title)
 
Qt::WindowType windowType () const const
 
WId winId () const const
 
int x () const const
 
int y () const const
 
- Public Member Functions inherited from QObject
 QObject (QObject *parent)
 
QBindable< QString > bindableObjectName ()
 
bool blockSignals (bool block)
 
const QObjectList & children () const const
 
QMetaObject::Connection connect (const QObject *sender, const char *signal, const char *method, Qt::ConnectionType type) const const
 
void deleteLater ()
 
void destroyed (QObject *obj)
 
bool disconnect (const char *signal, const QObject *receiver, const char *method) const const
 
bool disconnect (const QObject *receiver, const char *method) const const
 
void dumpObjectInfo () const const
 
void dumpObjectTree () const const
 
QList< QByteArray > dynamicPropertyNames () const const
 
T findChild (const QString &name, Qt::FindChildOptions options) const const
 
QList< T > findChildren (const QRegularExpression &re, Qt::FindChildOptions options) const const
 
QList< T > findChildren (const QString &name, Qt::FindChildOptions options) const const
 
QList< T > findChildren (Qt::FindChildOptions options) const const
 
bool inherits (const char *className) const const
 
void installEventFilter (QObject *filterObj)
 
bool isQuickItemType () const const
 
bool isWidgetType () const const
 
bool isWindowType () const const
 
void killTimer (int id)
 
virtual const QMetaObject * metaObject () const const
 
void moveToThread (QThread *targetThread)
 
QString objectName () const const
 
void objectNameChanged (const QString &objectName)
 
QObject * parent () const const
 
QVariant property (const char *name) const const
 
 Q_CLASSINFO (Name, Value)
 
 Q_EMIT Q_EMIT
 
 Q_ENUM (...)
 
 Q_ENUM_NS (...)
 
 Q_ENUMS (...)
 
 Q_FLAG (...)
 
 Q_FLAG_NS (...)
 
 Q_FLAGS (...)
 
 Q_GADGET Q_GADGET
 
 Q_GADGET_EXPORT (EXPORT_MACRO)
 
 Q_INTERFACES (...)
 
 Q_INVOKABLE Q_INVOKABLE
 
 Q_MOC_INCLUDE Q_MOC_INCLUDE
 
 Q_NAMESPACE Q_NAMESPACE
 
 Q_NAMESPACE_EXPORT (EXPORT_MACRO)
 
 Q_OBJECT Q_OBJECT
 
 Q_PROPERTY (...)
 
 Q_REVISION Q_REVISION
 
 Q_SET_OBJECT_NAME (Object)
 
 Q_SIGNAL Q_SIGNAL
 
 Q_SIGNALS Q_SIGNALS
 
 Q_SLOT Q_SLOT
 
 Q_SLOTS Q_SLOTS
 
T qobject_cast (const QObject *object)
 
T qobject_cast (QObject *object)
 
 QT_NO_NARROWING_CONVERSIONS_IN_CONNECT QT_NO_NARROWING_CONVERSIONS_IN_CONNECT
 
void removeEventFilter (QObject *obj)
 
void setObjectName (const QString &name)
 
void setObjectName (QAnyStringView name)
 
void setParent (QObject *parent)
 
bool setProperty (const char *name, const QVariant &value)
 
bool setProperty (const char *name, QVariant &&value)
 
bool signalsBlocked () const const
 
int startTimer (int interval, Qt::TimerType timerType)
 
int startTimer (std::chrono::milliseconds interval, Qt::TimerType timerType)
 
QThread * thread () const const
 
- Public Member Functions inherited from QPaintDevice
int colorCount () const const
 
int depth () const const
 
qreal devicePixelRatio () const const
 
qreal devicePixelRatioF () const const
 
int height () const const
 
int heightMM () const const
 
int logicalDpiX () const const
 
int logicalDpiY () const const
 
bool paintingActive () const const
 
int physicalDpiX () const const
 
int physicalDpiY () const const
 
int width () const const
 
int widthMM () const const
 

Protected Slots

virtual void modelDataChanged ()
 

Protected Member Functions

virtual QRect drawItem (QPainter *painter, const QModelIndex &index, const QPoint &pos=QPoint()) const
 
virtual StyleOptionGanttItem getStyleOption (const QModelIndex &index) const
 
int horizontalOffset () const override
 
bool isIndexHidden (const QModelIndex &) const override
 
virtual QSize measureItem (const QModelIndex &index, bool recursive=true) const
 
QModelIndex moveCursor (CursorAction, Qt::KeyboardModifiers) override
 
void paintEvent (QPaintEvent *event) override
 
void setSelection (const QRect &, QItemSelectionModel::SelectionFlags) override
 
int verticalOffset () const override
 
QRegion visualRegionForSelection (const QItemSelection &) const override
 
- Protected Member Functions inherited from QAbstractItemView
virtual void closeEditor (QWidget *editor, QAbstractItemDelegate::EndEditHint hint)
 
virtual void commitData (QWidget *editor)
 
virtual void currentChanged (const QModelIndex &current, const QModelIndex &previous)
 
virtual void dataChanged (const QModelIndex &topLeft, const QModelIndex &bottomRight, const QList< int > &roles)
 
QPoint dirtyRegionOffset () const const
 
virtual void dragEnterEvent (QDragEnterEvent *event) override
 
virtual void dragLeaveEvent (QDragLeaveEvent *event) override
 
virtual void dragMoveEvent (QDragMoveEvent *event) override
 
virtual void dropEvent (QDropEvent *event) override
 
DropIndicatorPosition dropIndicatorPosition () const const
 
virtual bool edit (const QModelIndex &index, EditTrigger trigger, QEvent *event)
 
virtual void editorDestroyed (QObject *editor)
 
virtual bool event (QEvent *event) override
 
virtual bool eventFilter (QObject *object, QEvent *event) override
 
void executeDelayedItemsLayout ()
 
virtual void focusInEvent (QFocusEvent *event) override
 
virtual bool focusNextPrevChild (bool next) override
 
virtual void focusOutEvent (QFocusEvent *event) override
 
virtual void initViewItemOption (QStyleOptionViewItem *option) const const
 
virtual void inputMethodEvent (QInputMethodEvent *event) override
 
virtual void keyPressEvent (QKeyEvent *event) override
 
virtual void mouseDoubleClickEvent (QMouseEvent *event) override
 
virtual void mouseMoveEvent (QMouseEvent *event) override
 
virtual void mousePressEvent (QMouseEvent *event) override
 
virtual void mouseReleaseEvent (QMouseEvent *event) override
 
virtual void resizeEvent (QResizeEvent *event) override
 
virtual void rowsAboutToBeRemoved (const QModelIndex &parent, int start, int end)
 
virtual void rowsInserted (const QModelIndex &parent, int start, int end)
 
void scheduleDelayedItemsLayout ()
 
void scrollDirtyRegion (int dx, int dy)
 
virtual QModelIndexList selectedIndexes () const const
 
virtual void selectionChanged (const QItemSelection &selected, const QItemSelection &deselected)
 
virtual QItemSelectionModel::SelectionFlags selectionCommand (const QModelIndex &index, const QEvent *event) const const
 
void setDirtyRegion (const QRegion &region)
 
void setState (State state)
 
virtual void startDrag (Qt::DropActions supportedActions)
 
State state () const const
 
virtual void timerEvent (QTimerEvent *event) override
 
virtual void updateGeometries ()
 
virtual bool viewportEvent (QEvent *event) override
 
virtual QSize viewportSizeHint () const const override
 
- Protected Member Functions inherited from QAbstractScrollArea
virtual void contextMenuEvent (QContextMenuEvent *e) override
 
virtual void scrollContentsBy (int dx, int dy)
 
void setViewportMargins (const QMargins &margins)
 
void setViewportMargins (int left, int top, int right, int bottom)
 
QMargins viewportMargins () const const
 
virtual void wheelEvent (QWheelEvent *e) override
 
- Protected Member Functions inherited from QFrame
virtual void changeEvent (QEvent *ev) override
 
virtual void initStyleOption (QStyleOptionFrame *option) const const
 
- Protected Member Functions inherited from QWidget
virtual void actionEvent (QActionEvent *event)
 
virtual void closeEvent (QCloseEvent *event)
 
void create (WId window, bool initializeWindow, bool destroyOldWindow)
 
void destroy (bool destroyWindow, bool destroySubWindows)
 
virtual void enterEvent (QEnterEvent *event)
 
bool focusNextChild ()
 
bool focusPreviousChild ()
 
virtual void hideEvent (QHideEvent *event)
 
virtual void initPainter (QPainter *painter) const const override
 
virtual void keyReleaseEvent (QKeyEvent *event)
 
virtual void leaveEvent (QEvent *event)
 
virtual int metric (PaintDeviceMetric m) const const override
 
virtual void moveEvent (QMoveEvent *event)
 
virtual bool nativeEvent (const QByteArray &eventType, void *message, qintptr *result)
 
virtual void showEvent (QShowEvent *event)
 
virtual void tabletEvent (QTabletEvent *event)
 
void updateMicroFocus (Qt::InputMethodQuery query)
 
- Protected Member Functions inherited from QObject
virtual void childEvent (QChildEvent *event)
 
virtual void connectNotify (const QMetaMethod &signal)
 
virtual void customEvent (QEvent *event)
 
virtual void disconnectNotify (const QMetaMethod &signal)
 
bool isSignalConnected (const QMetaMethod &signal) const const
 
int receivers (const char *signal) const const
 
QObject * sender () const const
 
int senderSignalIndex () const const
 

Additional Inherited Members

- Public Types inherited from QAbstractItemView
enum  CursorAction
 
enum  DragDropMode
 
enum  DropIndicatorPosition
 
enum  EditTrigger
 
enum  ScrollHint
 
enum  ScrollMode
 
enum  SelectionBehavior
 
enum  SelectionMode
 
enum  State
 
- Public Types inherited from QAbstractScrollArea
enum  SizeAdjustPolicy
 
- Public Types inherited from QFrame
enum  Shadow
 
enum  Shape
 
enum  StyleMask
 
- Public Types inherited from QWidget
enum  RenderFlag
 
- Public Types inherited from QPaintDevice
enum  PaintDeviceMetric
 
- Properties inherited from QAbstractItemView
 alternatingRowColors
 
 autoScroll
 
 autoScrollMargin
 
 defaultDropAction
 
 dragDropMode
 
 dragDropOverwriteMode
 
 dragEnabled
 
 editTriggers
 
 horizontalScrollMode
 
 iconSize
 
 selectionBehavior
 
 selectionMode
 
 showDropIndicator
 
 tabKeyNavigation
 
 textElideMode
 
 verticalScrollMode
 
- Properties inherited from QAbstractScrollArea
 horizontalScrollBarPolicy
 
 sizeAdjustPolicy
 
 verticalScrollBarPolicy
 
- Properties inherited from QFrame
 frameRect
 
 frameShadow
 
 frameShape
 
 frameWidth
 
 lineWidth
 
 midLineWidth
 
- Properties inherited from QWidget
 acceptDrops
 
 accessibleDescription
 
 accessibleName
 
 autoFillBackground
 
 baseSize
 
 childrenRect
 
 childrenRegion
 
 contextMenuPolicy
 
 cursor
 
 enabled
 
 focus
 
 focusPolicy
 
 font
 
 frameGeometry
 
 frameSize
 
 fullScreen
 
 geometry
 
 height
 
 inputMethodHints
 
 isActiveWindow
 
 layoutDirection
 
 locale
 
 maximized
 
 maximumHeight
 
 maximumSize
 
 maximumWidth
 
 minimized
 
 minimumHeight
 
 minimumSize
 
 minimumSizeHint
 
 minimumWidth
 
 modal
 
 mouseTracking
 
 normalGeometry
 
 palette
 
 pos
 
 rect
 
 size
 
 sizeHint
 
 sizeIncrement
 
 sizePolicy
 
 statusTip
 
 styleSheet
 
 tabletTracking
 
 toolTip
 
 toolTipDuration
 
 updatesEnabled
 
 visible
 
 whatsThis
 
 width
 
 windowFilePath
 
 windowFlags
 
 windowIcon
 
 windowIconText
 
 windowModality
 
 windowModified
 
 windowOpacity
 
 windowTitle
 
 x
 
 y
 
- Properties inherited from QObject
 objectName
 
- Static Public Member Functions inherited from QWidget
QWidget * createWindowContainer (QWindow *window, QWidget *parent, Qt::WindowFlags flags)
 
QWidget * find (WId id)
 
QWidget * keyboardGrabber ()
 
QWidget * mouseGrabber ()
 
void setTabOrder (QWidget *first, QWidget *second)
 
void setTabOrder (std::initializer_list< QWidget * > widgets)
 
- Static Public Member Functions inherited from QObject
QMetaObject::Connection connect (const QObject *sender, const char *signal, const QObject *receiver, const char *method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, const QObject *context, Functor functor, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, const QObject *receiver, PointerToMemberFunction method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, Functor functor)
 
bool disconnect (const QMetaObject::Connection &connection)
 
bool disconnect (const QObject *sender, const char *signal, const QObject *receiver, const char *method)
 
bool disconnect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method)
 
bool disconnect (const QObject *sender, PointerToMemberFunction signal, const QObject *receiver, PointerToMemberFunction method)
 
QString tr (const char *sourceText, const char *disambiguation, int n)
 
- Public Attributes inherited from QAbstractItemView
 AboveItem
 
 AllEditTriggers
 
 AnimatingState
 
 AnyKeyPressed
 
 BelowItem
 
 CollapsingState
 
 ContiguousSelection
 
 CurrentChanged
 
 DoubleClicked
 
 DragDrop
 
 DraggingState
 
 DragOnly
 
 DragSelectingState
 
 DropOnly
 
 EditingState
 
 EditKeyPressed
 
typedef EditTriggers
 
 EnsureVisible
 
 ExpandingState
 
 ExtendedSelection
 
 InternalMove
 
 MoveDown
 
 MoveEnd
 
 MoveHome
 
 MoveLeft
 
 MoveNext
 
 MovePageDown
 
 MovePageUp
 
 MovePrevious
 
 MoveRight
 
 MoveUp
 
 MultiSelection
 
 NoDragDrop
 
 NoEditTriggers
 
 NoSelection
 
 NoState
 
 OnItem
 
 OnViewport
 
 PositionAtBottom
 
 PositionAtCenter
 
 PositionAtTop
 
 ScrollPerItem
 
 ScrollPerPixel
 
 SelectColumns
 
 SelectedClicked
 
 SelectItems
 
 SelectRows
 
 SingleSelection
 
- Public Attributes inherited from QAbstractScrollArea
 AdjustIgnored
 
 AdjustToContents
 
 AdjustToContentsOnFirstShow
 
- Public Attributes inherited from QFrame
 Box
 
 HLine
 
 NoFrame
 
 Panel
 
 Plain
 
 Raised
 
 Shadow_Mask
 
 Shape_Mask
 
 StyledPanel
 
 Sunken
 
 VLine
 
 WinPanel
 
- Public Attributes inherited from QWidget
 DrawChildren
 
 DrawWindowBackground
 
 IgnoreMask
 
typedef RenderFlags
 
- Public Attributes inherited from QObject
typedef QObjectList
 
- Public Attributes inherited from QPaintDevice
 PdmDepth
 
 PdmDevicePixelRatio
 
 PdmDevicePixelRatioScaled
 
 PdmDpiX
 
 PdmDpiY
 
 PdmHeight
 
 PdmHeightMM
 
 PdmNumColors
 
 PdmPhysicalDpiX
 
 PdmPhysicalDpiY
 
 PdmWidth
 
 PdmWidthMM
 

Detailed Description

Legend showing an image and a description for Gantt items.

This is an item view class showing a small Gantt item and it's text defined by LegendRole.

Definition at line 27 of file kganttlegend.h.

Constructor & Destructor Documentation

◆ Legend()

Legend::Legend ( QWidget * parent = nullptr)
explicit

Constructor. Creates a Legend with parent parent. The QObject parent is not used for anything internally.

Definition at line 22 of file kganttlegend.cpp.

◆ ~Legend()

Legend::~Legend ( )
override

Destructor. Does nothing

Definition at line 31 of file kganttlegend.cpp.

Member Function Documentation

◆ drawItem()

QRect Legend::drawItem ( QPainter * painter,
const QModelIndex & index,
const QPoint & pos = QPoint() ) const
protectedvirtual

Draws the legend item at index and all of it's children recursively at pos onto painter. Reimplement this if you want to draw items in an user defined way.

Returns
the rectangle drawn.

Definition at line 112 of file kganttlegend.cpp.

◆ getStyleOption()

StyleOptionGanttItem Legend::getStyleOption ( const QModelIndex & index) const
protectedvirtual

Creates a StyleOptionGanttItem with all style options filled in except the target rectangles.

Definition at line 101 of file kganttlegend.cpp.

◆ horizontalOffset()

int KGantt::Legend::horizontalOffset ( ) const
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 69 of file kganttlegend.h.

◆ indexAt()

QModelIndex Legend::indexAt ( const QPoint & point) const
overridevirtual

Implements QAbstractItemView.

Definition at line 38 of file kganttlegend.cpp.

◆ isIndexHidden()

bool KGantt::Legend::isIndexHidden ( const QModelIndex & ) const
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 70 of file kganttlegend.h.

◆ measureItem()

QSize Legend::measureItem ( const QModelIndex & index,
bool recursive = true ) const
protectedvirtual

Calculates the needed space for the legend item at index and, if recursive is true, all child items.

Definition at line 152 of file kganttlegend.cpp.

◆ minimumSizeHint()

QSize Legend::minimumSizeHint ( ) const
overridevirtual

Reimplemented from QAbstractScrollArea.

Definition at line 55 of file kganttlegend.cpp.

◆ modelDataChanged

void Legend::modelDataChanged ( )
protectedvirtualslot

Triggers repainting of the legend.

Definition at line 82 of file kganttlegend.cpp.

◆ moveCursor()

QModelIndex KGantt::Legend::moveCursor ( CursorAction ,
Qt::KeyboardModifiers  )
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 71 of file kganttlegend.h.

◆ paintEvent()

void Legend::paintEvent ( QPaintEvent * event)
overrideprotectedvirtual

Reimplemented from QAbstractScrollArea.

Definition at line 88 of file kganttlegend.cpp.

◆ scrollTo()

void KGantt::Legend::scrollTo ( const QModelIndex & ,
ScrollHint = EnsureVisible )
inlineoverridevirtual

Implements QAbstractItemView.

Definition at line 42 of file kganttlegend.h.

◆ setModel()

void Legend::setModel ( QAbstractItemModel * model)
overridevirtual

Reimplemented from QAbstractItemView.

Definition at line 60 of file kganttlegend.cpp.

◆ setSelection()

void KGantt::Legend::setSelection ( const QRect & ,
QItemSelectionModel::SelectionFlags  )
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 72 of file kganttlegend.h.

◆ sizeHint()

QSize Legend::sizeHint ( void ) const
overridevirtual

Reimplemented from QAbstractScrollArea.

Definition at line 50 of file kganttlegend.cpp.

◆ verticalOffset()

int KGantt::Legend::verticalOffset ( ) const
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 73 of file kganttlegend.h.

◆ visualRect()

QRect Legend::visualRect ( const QModelIndex & index) const
overridevirtual

Implements QAbstractItemView.

Definition at line 44 of file kganttlegend.cpp.

◆ visualRegionForSelection()

QRegion KGantt::Legend::visualRegionForSelection ( const QItemSelection & ) const
inlineoverrideprotectedvirtual

Implements QAbstractItemView.

Definition at line 74 of file kganttlegend.h.


The documentation for this class was generated from the following files:
This file is part of the KDE documentation.
Documentation copyright © 1996-2025 The KDE developers.
Generated on Fri May 2 2025 11:54:20 by doxygen 1.13.2 written by Dimitri van Heesch, © 1997-2006

KDE's Doxygen guidelines are available online.