KGantt::GraphicsView

Search for usage in LXR

#include <KGanttGraphicsView>

Inheritance diagram for KGantt::GraphicsView:

Properties

bool readOnly
 
- Properties inherited from QGraphicsView
 alignment
 
 backgroundBrush
 
 cacheMode
 
 dragMode
 
 foregroundBrush
 
 interactive
 
 optimizationFlags
 
 renderHints
 
 resizeAnchor
 
 rubberBandSelectionMode
 
 sceneRect
 
 transformationAnchor
 
 viewportUpdateMode
 
- Properties inherited from QAbstractScrollArea
 horizontalScrollBarPolicy
 
 sizeAdjustPolicy
 
 verticalScrollBarPolicy
 
- Properties inherited from QFrame
 frameRect
 
 frameShadow
 
 frameShape
 
 frameWidth
 
 lineWidth
 
 midLineWidth
 
- Properties inherited from QWidget
 acceptDrops
 
 accessibleDescription
 
 accessibleName
 
 autoFillBackground
 
 baseSize
 
 childrenRect
 
 childrenRegion
 
 contextMenuPolicy
 
 cursor
 
 enabled
 
 focus
 
 focusPolicy
 
 font
 
 frameGeometry
 
 frameSize
 
 fullScreen
 
 geometry
 
 height
 
 inputMethodHints
 
 isActiveWindow
 
 layoutDirection
 
 locale
 
 maximized
 
 maximumHeight
 
 maximumSize
 
 maximumWidth
 
 minimized
 
 minimumHeight
 
 minimumSize
 
 minimumSizeHint
 
 minimumWidth
 
 modal
 
 mouseTracking
 
 normalGeometry
 
 palette
 
 pos
 
 rect
 
 size
 
 sizeHint
 
 sizeIncrement
 
 sizePolicy
 
 statusTip
 
 styleSheet
 
 tabletTracking
 
 toolTip
 
 toolTipDuration
 
 updatesEnabled
 
 visible
 
 whatsThis
 
 width
 
 windowFilePath
 
 windowFlags
 
 windowIcon
 
 windowIconText
 
 windowModality
 
 windowModified
 
 windowOpacity
 
 windowTitle
 
 x
 
 y
 
- Properties inherited from QObject
 objectName
 

Signals

void activated (const QModelIndex &index)
 
void clicked (const QModelIndex &index)
 
void entered (const QModelIndex &index)
 
void headerContextMenuRequested (const QPoint &pt)
 
void pressed (const QModelIndex &index)
 
void qrealClicked (const QModelIndex &index)
 

Public Slots

void setConstraintModel (KGantt::ConstraintModel *)
 
void setGrid (KGantt::AbstractGrid *)
 
void setItemDelegate (KGantt::ItemDelegate *delegate)
 
void setModel (QAbstractItemModel *)
 
void setReadOnly (bool)
 
void setRootIndex (const QModelIndex &)
 
void setRowController (KGantt::AbstractRowController *)
 
void setSelectionModel (QItemSelectionModel *)
 
void setSummaryHandlingModel (QAbstractProxyModel *model)
 
void updateSceneRect ()
 

Public Member Functions

 GraphicsView (QWidget *parent=nullptr)
 
 ~GraphicsView () override
 
virtual void addConstraint (const QModelIndex &from, const QModelIndex &to, Qt::KeyboardModifiers modifiers)
 
ConstraintModel * constraintModel () const
 
void deleteSubtree (const QModelIndex &)
 
AbstractGrid * grid () const
 
Qt::ContextMenuPolicy headerContextMenuPolicy () const
 
QModelIndex indexAt (const QPoint &pos) const
 
bool isReadOnly () const
 
ItemDelegate * itemDelegate () const
 
QAbstractItemModel * model () const
 
void print (QPainter *painter, const QRectF &target=QRectF(), bool drawRowLabels=true, bool drawColumnLabels=true)
 
void print (QPainter *painter, qreal start, qreal end, const QRectF &target=QRectF(), bool drawRowLabels=true, bool drawColumnLabels=true)
 
void print (QPrinter *printer, bool drawRowLabels=true, bool drawColumnLabels=true)
 
void print (QPrinter *printer, qreal start, qreal end, bool drawRowLabels=true, bool drawColumnLabels=true)
 
void printDiagram (QPrinter *printer, const PrintingContext &context)
 
QModelIndex rootIndex () const
 
AbstractRowController * rowController () const
 
QItemSelectionModel * selectionModel () const
 
void setHeaderContextMenuPolicy (Qt::ContextMenuPolicy)
 
QAbstractProxyModel * summaryHandlingModel () const
 
AbstractGrid * takeGrid ()
 
void updateRow (const QModelIndex &)
 
void updateScene ()
 
- Public Member Functions inherited from QGraphicsView
 QGraphicsView (QGraphicsScene *scene, QWidget *parent)
 
 QGraphicsView (QWidget *parent)
 
Qt::Alignment alignment () const const
 
QBrush backgroundBrush () const const
 
CacheMode cacheMode () const const
 
void centerOn (const QGraphicsItem *item)
 
void centerOn (const QPointF &pos)
 
void centerOn (qreal x, qreal y)
 
DragMode dragMode () const const
 
void ensureVisible (const QGraphicsItem *item, int xmargin, int ymargin)
 
void ensureVisible (const QRectF &rect, int xmargin, int ymargin)
 
void ensureVisible (qreal x, qreal y, qreal w, qreal h, int xmargin, int ymargin)
 
void fitInView (const QGraphicsItem *item, Qt::AspectRatioMode aspectRatioMode)
 
void fitInView (const QRectF &rect, Qt::AspectRatioMode aspectRatioMode)
 
void fitInView (qreal x, qreal y, qreal w, qreal h, Qt::AspectRatioMode aspectRatioMode)
 
QBrush foregroundBrush () const const
 
virtual QVariant inputMethodQuery (Qt::InputMethodQuery query) const const override
 
void invalidateScene (const QRectF &rect, QGraphicsScene::SceneLayers layers)
 
bool isInteractive () const const
 
bool isTransformed () const const
 
QGraphicsItem * itemAt (const QPoint &pos) const const
 
QGraphicsItem * itemAt (int x, int y) const const
 
QList< QGraphicsItem * > items () const const
 
QList< QGraphicsItem * > items (const QPainterPath &path, Qt::ItemSelectionMode mode) const const
 
QList< QGraphicsItem * > items (const QPoint &pos) const const
 
QList< QGraphicsItem * > items (const QPolygon &polygon, Qt::ItemSelectionMode mode) const const
 
QList< QGraphicsItem * > items (const QRect &rect, Qt::ItemSelectionMode mode) const const
 
QList< QGraphicsItem * > items (int x, int y) const const
 
QList< QGraphicsItem * > items (int x, int y, int w, int h, Qt::ItemSelectionMode mode) const const
 
QPainterPath mapFromScene (const QPainterPath &path) const const
 
QPoint mapFromScene (const QPointF &point) const const
 
QPolygon mapFromScene (const QPolygonF &polygon) const const
 
QPolygon mapFromScene (const QRectF &rect) const const
 
QPoint mapFromScene (qreal x, qreal y) const const
 
QPolygon mapFromScene (qreal x, qreal y, qreal w, qreal h) const const
 
QPainterPath mapToScene (const QPainterPath &path) const const
 
QPointF mapToScene (const QPoint &point) const const
 
QPolygonF mapToScene (const QPolygon &polygon) const const
 
QPolygonF mapToScene (const QRect &rect) const const
 
QPointF mapToScene (int x, int y) const const
 
QPolygonF mapToScene (int x, int y, int w, int h) const const
 
OptimizationFlags optimizationFlags () const const
 
void render (QPainter *painter, const QRectF &target, const QRect &source, Qt::AspectRatioMode aspectRatioMode)
 
QPainter::RenderHints renderHints () const const
 
void resetCachedContent ()
 
void resetTransform ()
 
ViewportAnchor resizeAnchor () const const
 
void rotate (qreal angle)
 
void rubberBandChanged (QRect rubberBandRect, QPointF fromScenePoint, QPointF toScenePoint)
 
QRect rubberBandRect () const const
 
Qt::ItemSelectionMode rubberBandSelectionMode () const const
 
void scale (qreal sx, qreal sy)
 
QGraphicsScene * scene () const const
 
QRectF sceneRect () const const
 
void setAlignment (Qt::Alignment alignment)
 
void setBackgroundBrush (const QBrush &brush)
 
void setCacheMode (CacheMode mode)
 
void setDragMode (DragMode mode)
 
void setForegroundBrush (const QBrush &brush)
 
void setInteractive (bool allowed)
 
void setOptimizationFlag (OptimizationFlag flag, bool enabled)
 
void setOptimizationFlags (OptimizationFlags flags)
 
void setRenderHint (QPainter::RenderHint hint, bool enabled)
 
void setRenderHints (QPainter::RenderHints hints)
 
void setResizeAnchor (ViewportAnchor anchor)
 
void setRubberBandSelectionMode (Qt::ItemSelectionMode mode)
 
void setScene (QGraphicsScene *scene)
 
void setSceneRect (const QRectF &rect)
 
void setSceneRect (qreal x, qreal y, qreal w, qreal h)
 
void setTransform (const QTransform &matrix, bool combine)
 
void setTransformationAnchor (ViewportAnchor anchor)
 
void setViewportUpdateMode (ViewportUpdateMode mode)
 
void shear (qreal sh, qreal sv)
 
virtual QSize sizeHint () const const override
 
QTransform transform () const const
 
ViewportAnchor transformationAnchor () const const
 
void translate (qreal dx, qreal dy)
 
void updateScene (const QList< QRectF > &rects)
 
void updateSceneRect (const QRectF &rect)
 
QTransform viewportTransform () const const
 
ViewportUpdateMode viewportUpdateMode () const const
 
- Public Member Functions inherited from QAbstractScrollArea
 QAbstractScrollArea (QWidget *parent)
 
void addScrollBarWidget (QWidget *widget, Qt::Alignment alignment)
 
QWidget * cornerWidget () const const
 
QScrollBar * horizontalScrollBar () const const
 
Qt::ScrollBarPolicy horizontalScrollBarPolicy () const const
 
QSize maximumViewportSize () const const
 
virtual QSize minimumSizeHint () const const override
 
QWidgetList scrollBarWidgets (Qt::Alignment alignment)
 
void setCornerWidget (QWidget *widget)
 
void setHorizontalScrollBar (QScrollBar *scrollBar)
 
void setHorizontalScrollBarPolicy (Qt::ScrollBarPolicy)
 
void setSizeAdjustPolicy (SizeAdjustPolicy policy)
 
void setVerticalScrollBar (QScrollBar *scrollBar)
 
void setVerticalScrollBarPolicy (Qt::ScrollBarPolicy)
 
void setViewport (QWidget *widget)
 
SizeAdjustPolicy sizeAdjustPolicy () const const
 
QScrollBar * verticalScrollBar () const const
 
Qt::ScrollBarPolicy verticalScrollBarPolicy () const const
 
QWidget * viewport () const const
 
- Public Member Functions inherited from QFrame
 QFrame (QWidget *parent, Qt::WindowFlags f)
 
QRect frameRect () const const
 
Shadow frameShadow () const const
 
Shape frameShape () const const
 
int frameStyle () const const
 
int frameWidth () const const
 
int lineWidth () const const
 
int midLineWidth () const const
 
void setFrameRect (const QRect &)
 
void setFrameShadow (Shadow)
 
void setFrameShape (Shape)
 
void setFrameStyle (int style)
 
void setLineWidth (int)
 
void setMidLineWidth (int)
 
- Public Member Functions inherited from QWidget
 QWidget (QWidget *parent, Qt::WindowFlags f)
 
bool acceptDrops () const const
 
QString accessibleDescription () const const
 
QString accessibleName () const const
 
QList< QAction * > actions () const const
 
void activateWindow ()
 
QAction * addAction (const QIcon &icon, const QString &text)
 
QAction * addAction (const QIcon &icon, const QString &text, Args &&... args)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, Args &&... args)
 
QAction * addAction (const QIcon &icon, const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QIcon &icon, const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QString &text)
 
QAction * addAction (const QString &text, Args &&... args)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut, Args &&... args)
 
QAction * addAction (const QString &text, const QKeySequence &shortcut, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
QAction * addAction (const QString &text, const QObject *receiver, const char *member, Qt::ConnectionType type)
 
void addAction (QAction *action)
 
void addActions (const QList< QAction * > &actions)
 
void adjustSize ()
 
bool autoFillBackground () const const
 
QPalette::ColorRole backgroundRole () const const
 
QBackingStore * backingStore () const const
 
QSize baseSize () const const
 
QWidget * childAt (const QPoint &p) const const
 
QWidget * childAt (int x, int y) const const
 
QRect childrenRect () const const
 
QRegion childrenRegion () const const
 
void clearFocus ()
 
void clearMask ()
 
bool close ()
 
QMargins contentsMargins () const const
 
QRect contentsRect () const const
 
Qt::ContextMenuPolicy contextMenuPolicy () const const
 
QCursor cursor () const const
 
void customContextMenuRequested (const QPoint &pos)
 
WId effectiveWinId () const const
 
void ensurePolished () const const
 
Qt::FocusPolicy focusPolicy () const const
 
QWidget * focusProxy () const const
 
QWidget * focusWidget () const const
 
const QFont & font () const const
 
QFontInfo fontInfo () const const
 
QFontMetrics fontMetrics () const const
 
QPalette::ColorRole foregroundRole () const const
 
QRect frameGeometry () const const
 
QSize frameSize () const const
 
const QRect & geometry () const const
 
QPixmap grab (const QRect &rectangle)
 
void grabGesture (Qt::GestureType gesture, Qt::GestureFlags flags)
 
void grabKeyboard ()
 
void grabMouse ()
 
void grabMouse (const QCursor &cursor)
 
int grabShortcut (const QKeySequence &key, Qt::ShortcutContext context)
 
QGraphicsEffect * graphicsEffect () const const
 
QGraphicsProxyWidget * graphicsProxyWidget () const const
 
bool hasEditFocus () const const
 
bool hasFocus () const const
 
virtual bool hasHeightForWidth () const const
 
bool hasMouseTracking () const const
 
bool hasTabletTracking () const const
 
int height () const const
 
virtual int heightForWidth (int w) const const
 
void hide ()
 
Qt::InputMethodHints inputMethodHints () const const
 
void insertAction (QAction *before, QAction *action)
 
void insertActions (QAction *before, const QList< QAction * > &actions)
 
bool isActiveWindow () const const
 
bool isAncestorOf (const QWidget *child) const const
 
bool isEnabled () const const
 
bool isEnabledTo (const QWidget *ancestor) const const
 
bool isFullScreen () const const
 
bool isHidden () const const
 
bool isMaximized () const const
 
bool isMinimized () const const
 
bool isModal () const const
 
bool isTopLevel () const const
 
bool isVisible () const const
 
bool isVisibleTo (const QWidget *ancestor) const const
 
bool isWindow () const const
 
bool isWindowModified () const const
 
QLayout * layout () const const
 
Qt::LayoutDirection layoutDirection () const const
 
QLocale locale () const const
 
void lower ()
 
QPoint mapFrom (const QWidget *parent, const QPoint &pos) const const
 
QPointF mapFrom (const QWidget *parent, const QPointF &pos) const const
 
QPoint mapFromGlobal (const QPoint &pos) const const
 
QPointF mapFromGlobal (const QPointF &pos) const const
 
QPoint mapFromParent (const QPoint &pos) const const
 
QPointF mapFromParent (const QPointF &pos) const const
 
QPoint mapTo (const QWidget *parent, const QPoint &pos) const const
 
QPointF mapTo (const QWidget *parent, const QPointF &pos) const const
 
QPoint mapToGlobal (const QPoint &pos) const const
 
QPointF mapToGlobal (const QPointF &pos) const const
 
QPoint mapToParent (const QPoint &pos) const const
 
QPointF mapToParent (const QPointF &pos) const const
 
QRegion mask () const const
 
int maximumHeight () const const
 
QSize maximumSize () const const
 
int maximumWidth () const const
 
int minimumHeight () const const
 
QSize minimumSize () const const
 
int minimumWidth () const const
 
void move (const QPoint &)
 
void move (int x, int y)
 
QWidget * nativeParentWidget () const const
 
QWidget * nextInFocusChain () const const
 
QRect normalGeometry () const const
 
void overrideWindowFlags (Qt::WindowFlags flags)
 
virtual QPaintEngine * paintEngine () const const override
 
const QPalette & palette () const const
 
QWidget * parentWidget () const const
 
QPoint pos () const const
 
QWidget * previousInFocusChain () const const
 
 QWIDGETSIZE_MAX QWIDGETSIZE_MAX
 
void raise ()
 
QRect rect () const const
 
void releaseKeyboard ()
 
void releaseMouse ()
 
void releaseShortcut (int id)
 
void removeAction (QAction *action)
 
void render (QPaintDevice *target, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags)
 
void render (QPainter *painter, const QPoint &targetOffset, const QRegion &sourceRegion, RenderFlags renderFlags)
 
void repaint ()
 
void repaint (const QRect &rect)
 
void repaint (const QRegion &rgn)
 
void repaint (int x, int y, int w, int h)
 
void resize (const QSize &)
 
void resize (int w, int h)
 
bool restoreGeometry (const QByteArray &geometry)
 
QByteArray saveGeometry () const const
 
QScreen * screen () const const
 
void scroll (int dx, int dy)
 
void scroll (int dx, int dy, const QRect &r)
 
void setAcceptDrops (bool on)
 
void setAccessibleDescription (const QString &description)
 
void setAccessibleName (const QString &name)
 
void setAttribute (Qt::WidgetAttribute attribute, bool on)
 
void setAutoFillBackground (bool enabled)
 
void setBackgroundRole (QPalette::ColorRole role)
 
void setBaseSize (const QSize &)
 
void setBaseSize (int basew, int baseh)
 
void setContentsMargins (const QMargins &margins)
 
void setContentsMargins (int left, int top, int right, int bottom)
 
void setContextMenuPolicy (Qt::ContextMenuPolicy policy)
 
void setCursor (const QCursor &)
 
void setDisabled (bool disable)
 
void setEditFocus (bool enable)
 
void setEnabled (bool)
 
void setFixedHeight (int h)
 
void setFixedSize (const QSize &s)
 
void setFixedSize (int w, int h)
 
void setFixedWidth (int w)
 
void setFocus ()
 
void setFocus (Qt::FocusReason reason)
 
void setFocusPolicy (Qt::FocusPolicy policy)
 
void setFocusProxy (QWidget *w)
 
void setFont (const QFont &)
 
void setForegroundRole (QPalette::ColorRole role)
 
void setGeometry (const QRect &)
 
void setGeometry (int x, int y, int w, int h)
 
void setGraphicsEffect (QGraphicsEffect *effect)
 
void setHidden (bool hidden)
 
void setInputMethodHints (Qt::InputMethodHints hints)
 
void setLayout (QLayout *layout)
 
void setLayoutDirection (Qt::LayoutDirection direction)
 
void setLocale (const QLocale &locale)
 
void setMask (const QBitmap &bitmap)
 
void setMask (const QRegion &region)
 
void setMaximumHeight (int maxh)
 
void setMaximumSize (const QSize &)
 
void setMaximumSize (int maxw, int maxh)
 
void setMaximumWidth (int maxw)
 
void setMinimumHeight (int minh)
 
void setMinimumSize (const QSize &)
 
void setMinimumSize (int minw, int minh)
 
void setMinimumWidth (int minw)
 
void setMouseTracking (bool enable)
 
void setPalette (const QPalette &)
 
void setParent (QWidget *parent)
 
void setParent (QWidget *parent, Qt::WindowFlags f)
 
void setScreen (QScreen *screen)
 
void setShortcutAutoRepeat (int id, bool enable)
 
void setShortcutEnabled (int id, bool enable)
 
void setSizeIncrement (const QSize &)
 
void setSizeIncrement (int w, int h)
 
void setSizePolicy (QSizePolicy)
 
void setSizePolicy (QSizePolicy::Policy horizontal, QSizePolicy::Policy vertical)
 
void setStatusTip (const QString &)
 
void setStyle (QStyle *style)
 
void setStyleSheet (const QString &styleSheet)
 
void setTabletTracking (bool enable)
 
void setToolTip (const QString &)
 
void setToolTipDuration (int msec)
 
void setUpdatesEnabled (bool enable)
 
void setupUi (QWidget *widget)
 
virtual void setVisible (bool visible)
 
void setWhatsThis (const QString &)
 
void setWindowFilePath (const QString &filePath)
 
void setWindowFlag (Qt::WindowType flag, bool on)
 
void setWindowFlags (Qt::WindowFlags type)
 
void setWindowIcon (const QIcon &icon)
 
void setWindowIconText (const QString &)
 
void setWindowModality (Qt::WindowModality windowModality)
 
void setWindowModified (bool)
 
void setWindowOpacity (qreal level)
 
void setWindowRole (const QString &role)
 
void setWindowState (Qt::WindowStates windowState)
 
void setWindowTitle (const QString &)
 
void show ()
 
void showFullScreen ()
 
void showMaximized ()
 
void showMinimized ()
 
void showNormal ()
 
QSize size () const const
 
QSize sizeIncrement () const const
 
QSizePolicy sizePolicy () const const
 
void stackUnder (QWidget *w)
 
QString statusTip () const const
 
QStyle * style () const const
 
QString styleSheet () const const
 
bool testAttribute (Qt::WidgetAttribute attribute) const const
 
QString toolTip () const const
 
int toolTipDuration () const const
 
QWidget * topLevelWidget () const const
 
bool underMouse () const const
 
void ungrabGesture (Qt::GestureType gesture)
 
void unsetCursor ()
 
void unsetLayoutDirection ()
 
void unsetLocale ()
 
void update ()
 
void update (const QRect &rect)
 
void update (const QRegion &rgn)
 
void update (int x, int y, int w, int h)
 
void updateGeometry ()
 
bool updatesEnabled () const const
 
QRegion visibleRegion () const const
 
QString whatsThis () const const
 
int width () const const
 
QWidget * window () const const
 
QString windowFilePath () const const
 
Qt::WindowFlags windowFlags () const const
 
QWindow * windowHandle () const const
 
QIcon windowIcon () const const
 
void windowIconChanged (const QIcon &icon)
 
QString windowIconText () const const
 
void windowIconTextChanged (const QString &iconText)
 
Qt::WindowModality windowModality () const const
 
qreal windowOpacity () const const
 
QString windowRole () const const
 
Qt::WindowStates windowState () const const
 
QString windowTitle () const const
 
void windowTitleChanged (const QString &title)
 
Qt::WindowType windowType () const const
 
WId winId () const const
 
int x () const const
 
int y () const const
 
- Public Member Functions inherited from QObject
 QObject (QObject *parent)
 
QBindable< QString > bindableObjectName ()
 
bool blockSignals (bool block)
 
const QObjectList & children () const const
 
QMetaObject::Connection connect (const QObject *sender, const char *signal, const char *method, Qt::ConnectionType type) const const
 
void deleteLater ()
 
void destroyed (QObject *obj)
 
bool disconnect (const char *signal, const QObject *receiver, const char *method) const const
 
bool disconnect (const QObject *receiver, const char *method) const const
 
void dumpObjectInfo () const const
 
void dumpObjectTree () const const
 
QList< QByteArray > dynamicPropertyNames () const const
 
virtual bool eventFilter (QObject *watched, QEvent *event)
 
T findChild (const QString &name, Qt::FindChildOptions options) const const
 
QList< T > findChildren (const QRegularExpression &re, Qt::FindChildOptions options) const const
 
QList< T > findChildren (const QString &name, Qt::FindChildOptions options) const const
 
QList< T > findChildren (Qt::FindChildOptions options) const const
 
bool inherits (const char *className) const const
 
void installEventFilter (QObject *filterObj)
 
bool isQuickItemType () const const
 
bool isWidgetType () const const
 
bool isWindowType () const const
 
void killTimer (int id)
 
virtual const QMetaObject * metaObject () const const
 
void moveToThread (QThread *targetThread)
 
QString objectName () const const
 
void objectNameChanged (const QString &objectName)
 
QObject * parent () const const
 
QVariant property (const char *name) const const
 
 Q_CLASSINFO (Name, Value)
 
 Q_EMIT Q_EMIT
 
 Q_ENUM (...)
 
 Q_ENUM_NS (...)
 
 Q_ENUMS (...)
 
 Q_FLAG (...)
 
 Q_FLAG_NS (...)
 
 Q_FLAGS (...)
 
 Q_GADGET Q_GADGET
 
 Q_GADGET_EXPORT (EXPORT_MACRO)
 
 Q_INTERFACES (...)
 
 Q_INVOKABLE Q_INVOKABLE
 
 Q_MOC_INCLUDE Q_MOC_INCLUDE
 
 Q_NAMESPACE Q_NAMESPACE
 
 Q_NAMESPACE_EXPORT (EXPORT_MACRO)
 
 Q_OBJECT Q_OBJECT
 
 Q_PROPERTY (...)
 
 Q_REVISION Q_REVISION
 
 Q_SET_OBJECT_NAME (Object)
 
 Q_SIGNAL Q_SIGNAL
 
 Q_SIGNALS Q_SIGNALS
 
 Q_SLOT Q_SLOT
 
 Q_SLOTS Q_SLOTS
 
T qobject_cast (const QObject *object)
 
T qobject_cast (QObject *object)
 
 QT_NO_NARROWING_CONVERSIONS_IN_CONNECT QT_NO_NARROWING_CONVERSIONS_IN_CONNECT
 
void removeEventFilter (QObject *obj)
 
void setObjectName (const QString &name)
 
void setObjectName (QAnyStringView name)
 
void setParent (QObject *parent)
 
bool setProperty (const char *name, const QVariant &value)
 
bool setProperty (const char *name, QVariant &&value)
 
bool signalsBlocked () const const
 
int startTimer (int interval, Qt::TimerType timerType)
 
int startTimer (std::chrono::milliseconds interval, Qt::TimerType timerType)
 
QThread * thread () const const
 
- Public Member Functions inherited from QPaintDevice
int colorCount () const const
 
int depth () const const
 
qreal devicePixelRatio () const const
 
qreal devicePixelRatioF () const const
 
int height () const const
 
int heightMM () const const
 
int logicalDpiX () const const
 
int logicalDpiY () const const
 
bool paintingActive () const const
 
int physicalDpiX () const const
 
int physicalDpiY () const const
 
int width () const const
 
int widthMM () const const
 

Protected Member Functions

void clearItems ()
 
void resizeEvent (QResizeEvent *) override
 
- Protected Member Functions inherited from QGraphicsView
virtual void contextMenuEvent (QContextMenuEvent *event) override
 
virtual void dragEnterEvent (QDragEnterEvent *event) override
 
virtual void dragLeaveEvent (QDragLeaveEvent *event) override
 
virtual void dragMoveEvent (QDragMoveEvent *event) override
 
virtual void drawBackground (QPainter *painter, const QRectF &rect)
 
virtual void drawForeground (QPainter *painter, const QRectF &rect)
 
virtual void drawItems (QPainter *painter, int numItems, QGraphicsItem *[] items, const QStyleOptionGraphicsItem[] options)
 
virtual void dropEvent (QDropEvent *event) override
 
virtual bool event (QEvent *event) override
 
virtual void focusInEvent (QFocusEvent *event) override
 
virtual bool focusNextPrevChild (bool next) override
 
virtual void focusOutEvent (QFocusEvent *event) override
 
virtual void inputMethodEvent (QInputMethodEvent *event) override
 
virtual void keyPressEvent (QKeyEvent *event) override
 
virtual void keyReleaseEvent (QKeyEvent *event) override
 
virtual void mouseDoubleClickEvent (QMouseEvent *event) override
 
virtual void mouseMoveEvent (QMouseEvent *event) override
 
virtual void mousePressEvent (QMouseEvent *event) override
 
virtual void mouseReleaseEvent (QMouseEvent *event) override
 
virtual void paintEvent (QPaintEvent *event) override
 
virtual void scrollContentsBy (int dx, int dy) override
 
virtual void setupViewport (QWidget *widget) override
 
virtual void showEvent (QShowEvent *event) override
 
virtual bool viewportEvent (QEvent *event) override
 
virtual void wheelEvent (QWheelEvent *event) override
 
- Protected Member Functions inherited from QAbstractScrollArea
void setViewportMargins (const QMargins &margins)
 
void setViewportMargins (int left, int top, int right, int bottom)
 
QMargins viewportMargins () const const
 
virtual QSize viewportSizeHint () const const
 
- Protected Member Functions inherited from QFrame
virtual void changeEvent (QEvent *ev) override
 
virtual void initStyleOption (QStyleOptionFrame *option) const const
 
- Protected Member Functions inherited from QWidget
virtual void actionEvent (QActionEvent *event)
 
virtual void closeEvent (QCloseEvent *event)
 
void create (WId window, bool initializeWindow, bool destroyOldWindow)
 
void destroy (bool destroyWindow, bool destroySubWindows)
 
virtual void enterEvent (QEnterEvent *event)
 
bool focusNextChild ()
 
bool focusPreviousChild ()
 
virtual void hideEvent (QHideEvent *event)
 
virtual void initPainter (QPainter *painter) const const override
 
virtual void leaveEvent (QEvent *event)
 
virtual int metric (PaintDeviceMetric m) const const override
 
virtual void moveEvent (QMoveEvent *event)
 
virtual bool nativeEvent (const QByteArray &eventType, void *message, qintptr *result)
 
virtual void tabletEvent (QTabletEvent *event)
 
void updateMicroFocus (Qt::InputMethodQuery query)
 
- Protected Member Functions inherited from QObject
virtual void childEvent (QChildEvent *event)
 
virtual void connectNotify (const QMetaMethod &signal)
 
virtual void customEvent (QEvent *event)
 
virtual void disconnectNotify (const QMetaMethod &signal)
 
bool isSignalConnected (const QMetaMethod &signal) const const
 
int receivers (const char *signal) const const
 
QObject * sender () const const
 
int senderSignalIndex () const const
 
virtual void timerEvent (QTimerEvent *event)
 

Additional Inherited Members

- Public Types inherited from QGraphicsView
enum  CacheModeFlag
 
enum  DragMode
 
enum  OptimizationFlag
 
enum  ViewportAnchor
 
enum  ViewportUpdateMode
 
- Public Types inherited from QAbstractScrollArea
enum  SizeAdjustPolicy
 
- Public Types inherited from QFrame
enum  Shadow
 
enum  Shape
 
enum  StyleMask
 
- Public Types inherited from QWidget
enum  RenderFlag
 
- Public Types inherited from QPaintDevice
enum  PaintDeviceMetric
 
- Static Public Member Functions inherited from QWidget
QWidget * createWindowContainer (QWindow *window, QWidget *parent, Qt::WindowFlags flags)
 
QWidget * find (WId id)
 
QWidget * keyboardGrabber ()
 
QWidget * mouseGrabber ()
 
void setTabOrder (QWidget *first, QWidget *second)
 
void setTabOrder (std::initializer_list< QWidget * > widgets)
 
- Static Public Member Functions inherited from QObject
QMetaObject::Connection connect (const QObject *sender, const char *signal, const QObject *receiver, const char *method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, const QObject *context, Functor functor, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, const QObject *receiver, PointerToMemberFunction method, Qt::ConnectionType type)
 
QMetaObject::Connection connect (const QObject *sender, PointerToMemberFunction signal, Functor functor)
 
bool disconnect (const QMetaObject::Connection &connection)
 
bool disconnect (const QObject *sender, const char *signal, const QObject *receiver, const char *method)
 
bool disconnect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method)
 
bool disconnect (const QObject *sender, PointerToMemberFunction signal, const QObject *receiver, PointerToMemberFunction method)
 
QString tr (const char *sourceText, const char *disambiguation, int n)
 
- Public Attributes inherited from QGraphicsView
 AnchorUnderMouse
 
 AnchorViewCenter
 
 BoundingRectViewportUpdate
 
 CacheBackground
 
typedef CacheMode
 
 CacheNone
 
 DontAdjustForAntialiasing
 
 DontSavePainterState
 
 FullViewportUpdate
 
 IndirectPainting
 
 MinimalViewportUpdate
 
 NoAnchor
 
 NoDrag
 
 NoViewportUpdate
 
typedef OptimizationFlags
 
 RubberBandDrag
 
 ScrollHandDrag
 
 SmartViewportUpdate
 
- Public Attributes inherited from QAbstractScrollArea
 AdjustIgnored
 
 AdjustToContents
 
 AdjustToContentsOnFirstShow
 
- Public Attributes inherited from QFrame
 Box
 
 HLine
 
 NoFrame
 
 Panel
 
 Plain
 
 Raised
 
 Shadow_Mask
 
 Shape_Mask
 
 StyledPanel
 
 Sunken
 
 VLine
 
 WinPanel
 
- Public Attributes inherited from QWidget
 DrawChildren
 
 DrawWindowBackground
 
 IgnoreMask
 
typedef RenderFlags
 
- Public Attributes inherited from QObject
typedef QObjectList
 
- Public Attributes inherited from QPaintDevice
 PdmDepth
 
 PdmDevicePixelRatio
 
 PdmDevicePixelRatioScaled
 
 PdmDpiX
 
 PdmDpiY
 
 PdmHeight
 
 PdmHeightMM
 
 PdmNumColors
 
 PdmPhysicalDpiX
 
 PdmPhysicalDpiY
 
 PdmWidth
 
 PdmWidthMM
 

Detailed Description

The GraphicsView class provides a model/view implementation of a gantt chart.

Definition at line 36 of file kganttgraphicsview.h.

Property Documentation

◆ readOnly

bool KGantt::GraphicsView::readOnly
readwrite

Definition at line 40 of file kganttgraphicsview.h.

Constructor & Destructor Documentation

◆ GraphicsView()

GraphicsView::GraphicsView ( QWidget * parent = nullptr)
explicit

Constructor. Creates a new KGantt::GraphicsView with parent parent.

Definition at line 433 of file kganttgraphicsview.cpp.

◆ ~GraphicsView()

GraphicsView::~GraphicsView ( )
override

Destroys this view.

Definition at line 468 of file kganttgraphicsview.cpp.

Member Function Documentation

◆ addConstraint()

void GraphicsView::addConstraint ( const QModelIndex & from,
const QModelIndex & to,
Qt::KeyboardModifiers modifiers )
virtual

Adds a constraint from from to to. modifiers are the keyboard modifiers pressed by the user when the action is invoked.

Override this to control how constraints are added. The default implementation adds a soft constraint unless the Shift key is pressed, in that case it adds a hard constraint. If a constraint is already present, it is removed and nothing is added.

Definition at line 636 of file kganttgraphicsview.cpp.

◆ clearItems()

void GraphicsView::clearItems ( )
protected

Definition at line 686 of file kganttgraphicsview.cpp.

◆ constraintModel()

ConstraintModel * GraphicsView::constraintModel ( ) const
Returns
the KGantt::ConstraintModel displayed by this view.

Definition at line 531 of file kganttgraphicsview.cpp.

◆ deleteSubtree()

void GraphicsView::deleteSubtree ( const QModelIndex & idx)

Definition at line 756 of file kganttgraphicsview.cpp.

◆ grid()

AbstractGrid * GraphicsView::grid ( ) const
Returns
the AbstractGrid used by this view.

Definition at line 600 of file kganttgraphicsview.cpp.

◆ headerContextMenuPolicy()

Qt::ContextMenuPolicy GraphicsView::headerContextMenuPolicy ( ) const
Returns
the context menu policy for the header

Definition at line 630 of file kganttgraphicsview.cpp.

◆ headerContextMenuRequested

void KGantt::GraphicsView::headerContextMenuRequested ( const QPoint & pt)
signal

This signal is emitted when the header has contextMenuPolicy Qt::CustomContextMenu and the widget wants to show a context menu for the header. Unlike in QWidget::customContextMenuRequested() signal, pt is here in global coordinates.

◆ indexAt()

QModelIndex GraphicsView::indexAt ( const QPoint & pos) const
Returns
The QModelIndex for the item located at position pos in the view or an invalid index if no item was present at that position.

This is useful for for example contextmenus.

Definition at line 675 of file kganttgraphicsview.cpp.

◆ isReadOnly()

bool GraphicsView::isReadOnly ( ) const
Returns
true if the view is in read-only mode

Definition at line 618 of file kganttgraphicsview.cpp.

◆ itemDelegate()

ItemDelegate * GraphicsView::itemDelegate ( ) const
Returns
the ItemDelegate used by this view to render items

Definition at line 573 of file kganttgraphicsview.cpp.

◆ model()

QAbstractItemModel * GraphicsView::model ( ) const
Returns
the current model displayed by this view

Note: The returned model is not the model set with setModel()

See also
GraphicsView::setModel

Definition at line 491 of file kganttgraphicsview.cpp.

◆ print() [1/4]

void GraphicsView::print ( QPainter * painter,
const QRectF & target = QRectF(),
bool drawRowLabels = true,
bool drawColumnLabels = true )

Render the GanttView inside the rectangle target using the painter painter. If drawRowLabels is true (the default), each row will have it's label printed on the left side. If drawColumnLabels is true (the default), each column will have it's label printed at the top side.

Definition at line 774 of file kganttgraphicsview.cpp.

◆ print() [2/4]

void GraphicsView::print ( QPainter * painter,
qreal start,
qreal end,
const QRectF & target = QRectF(),
bool drawRowLabels = true,
bool drawColumnLabels = true )

Render the GanttView inside the rectangle target using the painter painter. If drawRowLabels is true (the default), each row will have it's label printed on the left side. If drawColumnLabels is true (the default), each column will have it's label printed at the top side.

To print a certain range of a chart with a DateTimeGrid, use qreal DateTimeGrid::mapFromDateTime( const QDateTime& dt) const to figure out the values for start and end.

Definition at line 780 of file kganttgraphicsview.cpp.

◆ print() [3/4]

void GraphicsView::print ( QPrinter * printer,
bool drawRowLabels = true,
bool drawColumnLabels = true )

Print the Gantt chart using printer. If drawRowLabels is true (the default), each row will have it's label printed on the left side. If drawColumnLabels is true (the default), each column will have it's label printed at the top side.

This version of print() will print multiple pages.

Definition at line 762 of file kganttgraphicsview.cpp.

◆ print() [4/4]

void GraphicsView::print ( QPrinter * printer,
qreal start,
qreal end,
bool drawRowLabels = true,
bool drawColumnLabels = true )

Print part of the Gantt chart from start to end using printer. If drawRowLabels is true (the default), each row will have it's label printed on the left side. If drawColumnLabels is true (the default), each column will have it's label printed at the top side.

This version of print() will print multiple pages.

To print a certain range of a chart with a DateTimeGrid, use qreal DateTimeGrid::mapFromDateTime( const QDateTime& dt) const to figure out the values for start and end.

Definition at line 768 of file kganttgraphicsview.cpp.

◆ printDiagram()

void GraphicsView::printDiagram ( QPrinter * printer,
const PrintingContext & context )

Print the Gantt chart on the printer in accordance with the PrintingContext context

See also
PrintingContext
Since
2.8.0

Definition at line 786 of file kganttgraphicsview.cpp.

◆ resizeEvent()

void GraphicsView::resizeEvent ( QResizeEvent * ev)
overrideprotectedvirtual

Reimplemented from QGraphicsView.

Definition at line 648 of file kganttgraphicsview.cpp.

◆ rootIndex()

QModelIndex GraphicsView::rootIndex ( ) const
Returns
the rootindex for this view.

Definition at line 549 of file kganttgraphicsview.cpp.

◆ rowController()

AbstractRowController * GraphicsView::rowController ( ) const
Returns
the AbstractRowController for this view.
See also
setRowController

Definition at line 587 of file kganttgraphicsview.cpp.

◆ selectionModel()

QItemSelectionModel * GraphicsView::selectionModel ( ) const
Returns
the QItemSelectionModel used by this view

Definition at line 561 of file kganttgraphicsview.cpp.

◆ setConstraintModel

void GraphicsView::setConstraintModel ( KGantt::ConstraintModel * cmodel)
slot

Sets the constraintmodel displayed by this view.

See also
KGantt::ConstraintModel.

Definition at line 525 of file kganttgraphicsview.cpp.

◆ setGrid

void GraphicsView::setGrid ( KGantt::AbstractGrid * grid)
slot

Sets the AbstractGrid for this view. The grid is an object that controls how QModelIndexes are mapped to and from the view and how the background and header is rendered.

See also
AbstractGrid and DateTimeGrid.

Definition at line 593 of file kganttgraphicsview.cpp.

◆ setHeaderContextMenuPolicy()

void GraphicsView::setHeaderContextMenuPolicy ( Qt::ContextMenuPolicy p)

Sets the context menu policy for the header. The default value Qt::DefaultContextMenu results in a standard context menu on the header that allows the user to set the scale and zoom.

Setting this to Qt::CustomContextMenu will cause the signal headerContextMenuRequested(const QPoint& pt) to be emitted instead.

See also
QWidget::setContextMenuPolicy( Qt::ContextMenuPolicy )

Definition at line 624 of file kganttgraphicsview.cpp.

◆ setItemDelegate

void GraphicsView::setItemDelegate ( KGantt::ItemDelegate * delegate)
slot

Sets the KGantt::ItemDelegate used for rendering items on this view.

See also
ItemDelegate and QAbstractItemDelegate.

Definition at line 567 of file kganttgraphicsview.cpp.

◆ setModel

void GraphicsView::setModel ( QAbstractItemModel * model)
slot

Sets the model to be displayed in this view to model. The view does not take ownership of the model.

To make a model work well with GraphicsView it must have a certain layout. Whether the model is flat or has a treestrucure is not important, as long as an AbstractRowController is provided that can navigate the model.

GraphicsView operates per row in the model. The data is always taken from the last item in the row. The ItemRoles used are Qt::DisplayRole and the roles defined in KGantt::ItemDataRole.

Note: This model is not returned by model()

See also
GraphicsView::model

Definition at line 476 of file kganttgraphicsview.cpp.

◆ setReadOnly

void GraphicsView::setReadOnly ( bool ro)
slot

Sets the view to read-only mode if to is true. The default is read/write if the model permits it.

Definition at line 612 of file kganttgraphicsview.cpp.

◆ setRootIndex

void GraphicsView::setRootIndex ( const QModelIndex & idx)
slot

Sets the root index of the model displayed by this view. Similar to QAbstractItemView::setRootIndex, default is QModelIndex().

Definition at line 543 of file kganttgraphicsview.cpp.

◆ setRowController

void GraphicsView::setRowController ( KGantt::AbstractRowController * rowcontroller)
slot

Sets the AbstractRowController used by this view. The AbstractRowController deals with the height and position of each row and with which parts of the model are displayed.

See also
AbstractRowController

Definition at line 579 of file kganttgraphicsview.cpp.

◆ setSelectionModel

void GraphicsView::setSelectionModel ( QItemSelectionModel * model)
slot

Sets the QItemSelectionModel used by this view to manage selections. Similar to QAbstractItemView::setSelectionModel

Definition at line 555 of file kganttgraphicsview.cpp.

◆ setSummaryHandlingModel

void GraphicsView::setSummaryHandlingModel ( QAbstractProxyModel * model)
slot

Definition at line 496 of file kganttgraphicsview.cpp.

◆ summaryHandlingModel()

QAbstractProxyModel * GraphicsView::summaryHandlingModel ( ) const
Returns
the KGantt::SummaryHandlingProxyModel used by this view.

Definition at line 537 of file kganttgraphicsview.cpp.

◆ takeGrid()

AbstractGrid * GraphicsView::takeGrid ( )
Returns
the AbstractGrid used by this view.

Definition at line 606 of file kganttgraphicsview.cpp.

◆ updateRow()

void GraphicsView::updateRow ( const QModelIndex & idx)

Definition at line 692 of file kganttgraphicsview.cpp.

◆ updateScene()

void GraphicsView::updateScene ( )

Resets the state of the view.

Definition at line 730 of file kganttgraphicsview.cpp.

◆ updateSceneRect

void GraphicsView::updateSceneRect ( )
slot

Adjusts the bounding rectangle of the scene.

Definition at line 698 of file kganttgraphicsview.cpp.


The documentation for this class was generated from the following files:
This file is part of the KDE documentation.