kdgantt2
#include <KDGanttGraphicsView>

Classes | |
| class | Private |
Public Slots | |
| void | setConstraintModel (ConstraintModel *) |
| void | setGrid (AbstractGrid *) |
| void | setItemDelegate (ItemDelegate *delegate) |
| void | setModel (QAbstractItemModel *) |
| void | setReadOnly (bool) |
| void | setRootIndex (const QModelIndex &) |
| void | setRowController (AbstractRowController *) |
| void | setSelectionModel (QItemSelectionModel *) |
| void | setSummaryHandlingModel (QAbstractProxyModel *model) |
| void | updateSceneRect () |
Signals | |
| void | activated (const QModelIndex &index) |
| void | clicked (const QModelIndex &index) |
| void | doubleClicked (const QModelIndex &index) |
| void | entered (const QModelIndex &index) |
| void | headerContextMenuRequested (const QPoint &pt) |
| void | pressed (const QModelIndex &index) |
Public Member Functions | |
| GraphicsView (QWidget *parent=0) | |
| virtual | ~GraphicsView () |
| virtual void | addConstraint (const QModelIndex &from, const QModelIndex &to, Qt::KeyboardModifiers modifiers) |
| void | clearItems () |
| ConstraintModel * | constraintModel () const |
| void | deleteSubtree (const QModelIndex &) |
| AbstractGrid * | grid () const |
| Qt::ContextMenuPolicy | headerContextMenuPolicy () const |
| QModelIndex | indexAt (const QPoint &pos) const |
| bool | isReadOnly () const |
| ItemDelegate * | itemDelegate () const |
| QAbstractItemModel * | model () const |
| void | print (QPrinter *printer, bool drawRowLabels=true) |
| void | print (QPrinter *printer, qreal start, qreal end, bool drawRowLabels=true) |
| void | print (QPainter *painter, const QRectF &target=QRectF(), bool drawRowLabels=true) |
| void | print (QPainter *painter, qreal start, qreal end, const QRectF &target=QRectF(), bool drawRowLabels=true) |
| QModelIndex | rootIndex () const |
| AbstractRowController * | rowController () const |
| QItemSelectionModel * | selectionModel () const |
| void | setHeaderContextMenuPolicy (Qt::ContextMenuPolicy) |
| QAbstractProxyModel * | summaryHandlingModel () const |
| void | updateRow (const QModelIndex &) |
| void | updateScene () |
Public Member Functions inherited from QGraphicsView | |
| QGraphicsView (QWidget *parent) | |
| QGraphicsView (QGraphicsScene *scene, QWidget *parent) | |
| ~QGraphicsView () | |
| Qt::Alignment | alignment () const |
| QBrush | backgroundBrush () const |
| CacheMode | cacheMode () const |
| void | centerOn (const QPointF &pos) |
| void | centerOn (qreal x, qreal y) |
| void | centerOn (const QGraphicsItem *item) |
| DragMode | dragMode () const |
| void | ensureVisible (const QRectF &rect, int xmargin, int ymargin) |
| void | ensureVisible (qreal x, qreal y, qreal w, qreal h, int xmargin, int ymargin) |
| void | ensureVisible (const QGraphicsItem *item, int xmargin, int ymargin) |
| void | fitInView (const QRectF &rect, Qt::AspectRatioMode aspectRatioMode) |
| void | fitInView (qreal x, qreal y, qreal w, qreal h, Qt::AspectRatioMode aspectRatioMode) |
| void | fitInView (const QGraphicsItem *item, Qt::AspectRatioMode aspectRatioMode) |
| QBrush | foregroundBrush () const |
| virtual QVariant | inputMethodQuery (Qt::InputMethodQuery query) const |
| void | invalidateScene (const QRectF &rect, QFlags< QGraphicsScene::SceneLayer > layers) |
| bool | isInteractive () const |
| bool | isTransformed () const |
| QGraphicsItem * | itemAt (const QPoint &pos) const |
| QGraphicsItem * | itemAt (int x, int y) const |
| QList< QGraphicsItem * > | items () const |
| QList< QGraphicsItem * > | items (const QPolygon &polygon, Qt::ItemSelectionMode mode) const |
| QList< QGraphicsItem * > | items (int x, int y) const |
| QList< QGraphicsItem * > | items (const QRect &rect, Qt::ItemSelectionMode mode) const |
| QList< QGraphicsItem * > | items (int x, int y, int w, int h, Qt::ItemSelectionMode mode) const |
| QList< QGraphicsItem * > | items (const QPainterPath &path, Qt::ItemSelectionMode mode) const |
| QList< QGraphicsItem * > | items (const QPoint &pos) const |
| QPoint | mapFromScene (const QPointF &point) const |
| QPolygon | mapFromScene (const QRectF &rect) const |
| QPolygon | mapFromScene (const QPolygonF &polygon) const |
| QPoint | mapFromScene (qreal x, qreal y) const |
| QPolygon | mapFromScene (qreal x, qreal y, qreal w, qreal h) const |
| QPainterPath | mapFromScene (const QPainterPath &path) const |
| QPolygonF | mapToScene (const QRect &rect) const |
| QPolygonF | mapToScene (const QPolygon &polygon) const |
| QPointF | mapToScene (const QPoint &point) const |
| QPolygonF | mapToScene (int x, int y, int w, int h) const |
| QPointF | mapToScene (int x, int y) const |
| QPainterPath | mapToScene (const QPainterPath &path) const |
| QMatrix | matrix () const |
| OptimizationFlags | optimizationFlags () const |
| void | render (QPainter *painter, const QRectF &target, const QRect &source, Qt::AspectRatioMode aspectRatioMode) |
| QPainter::RenderHints | renderHints () const |
| void | resetCachedContent () |
| void | resetMatrix () |
| void | resetTransform () |
| ViewportAnchor | resizeAnchor () const |
| void | rotate (qreal angle) |
| Qt::ItemSelectionMode | rubberBandSelectionMode () const |
| void | scale (qreal sx, qreal sy) |
| QGraphicsScene * | scene () const |
| QRectF | sceneRect () const |
| void | setAlignment (QFlags< Qt::AlignmentFlag > alignment) |
| void | setBackgroundBrush (const QBrush &brush) |
| void | setCacheMode (QFlags< QGraphicsView::CacheModeFlag > mode) |
| void | setDragMode (DragMode mode) |
| void | setForegroundBrush (const QBrush &brush) |
| void | setInteractive (bool allowed) |
| void | setMatrix (const QMatrix &matrix, bool combine) |
| void | setOptimizationFlag (OptimizationFlag flag, bool enabled) |
| void | setOptimizationFlags (QFlags< QGraphicsView::OptimizationFlag > flags) |
| void | setRenderHint (QPainter::RenderHint hint, bool enabled) |
| void | setRenderHints (QFlags< QPainter::RenderHint > hints) |
| void | setResizeAnchor (ViewportAnchor anchor) |
| void | setRubberBandSelectionMode (Qt::ItemSelectionMode mode) |
| void | setScene (QGraphicsScene *scene) |
| void | setSceneRect (qreal x, qreal y, qreal w, qreal h) |
| void | setSceneRect (const QRectF &rect) |
| void | setTransform (const QTransform &matrix, bool combine) |
| void | setTransformationAnchor (ViewportAnchor anchor) |
| void | setViewportUpdateMode (ViewportUpdateMode mode) |
| void | shear (qreal sh, qreal sv) |
| virtual QSize | sizeHint () const |
| QTransform | transform () const |
| ViewportAnchor | transformationAnchor () const |
| void | translate (qreal dx, qreal dy) |
| void | updateScene (const QList< QRectF > &rects) |
| void | updateSceneRect (const QRectF &rect) |
| QTransform | viewportTransform () const |
| ViewportUpdateMode | viewportUpdateMode () const |
Public Member Functions inherited from QAbstractScrollArea | |
| QAbstractScrollArea (QWidget *parent) | |
| ~QAbstractScrollArea () | |
| void | addScrollBarWidget (QWidget *widget, QFlags< Qt::AlignmentFlag > alignment) |
| QWidget * | cornerWidget () const |
| QScrollBar * | horizontalScrollBar () const |
| Qt::ScrollBarPolicy | horizontalScrollBarPolicy () const |
| QSize | maximumViewportSize () const |
| virtual QSize | minimumSizeHint () const |
| QWidgetList | scrollBarWidgets (QFlags< Qt::AlignmentFlag > alignment) |
| void | setCornerWidget (QWidget *widget) |
| void | setHorizontalScrollBar (QScrollBar *scrollBar) |
| void | setHorizontalScrollBarPolicy (Qt::ScrollBarPolicy) |
| void | setVerticalScrollBar (QScrollBar *scrollBar) |
| void | setVerticalScrollBarPolicy (Qt::ScrollBarPolicy) |
| void | setViewport (QWidget *widget) |
| QScrollBar * | verticalScrollBar () const |
| Qt::ScrollBarPolicy | verticalScrollBarPolicy () const |
| QWidget * | viewport () const |
Public Member Functions inherited from QFrame | |
| QFrame (QWidget *parent, QFlags< Qt::WindowType > f) | |
| QFrame (QWidget *parent, const char *name, QFlags< Qt::WindowType > f) | |
| ~QFrame () | |
| QRect | frameRect () const |
| Shadow | frameShadow () const |
| Shape | frameShape () const |
| int | frameStyle () const |
| int | frameWidth () const |
| int | lineWidth () const |
| int | midLineWidth () const |
| void | setFrameRect (const QRect &) |
| void | setFrameShadow (Shadow) |
| void | setFrameShape (Shape) |
| void | setFrameStyle (int style) |
| void | setLineWidth (int) |
| void | setMidLineWidth (int) |
Public Member Functions inherited from QWidget | |
| QWidget (QWidget *parent, QFlags< Qt::WindowType > f) | |
| QWidget (QWidget *parent, const char *name, QFlags< Qt::WindowType > f) | |
| ~QWidget () | |
| bool | acceptDrops () const |
| QString | accessibleDescription () const |
| QString | accessibleName () const |
| QList< QAction * > | actions () const |
| void | activateWindow () |
| void | addAction (QAction *action) |
| void | addActions (QList< QAction * > actions) |
| void | adjustSize () |
| bool | autoFillBackground () const |
| Qt::BackgroundMode | backgroundMode () const |
| QPoint | backgroundOffset () const |
| BackgroundOrigin | backgroundOrigin () const |
| QPalette::ColorRole | backgroundRole () const |
| QSize | baseSize () const |
| QString | caption () const |
| QWidget * | childAt (int x, int y, bool includeThis) const |
| QWidget * | childAt (const QPoint &p, bool includeThis) const |
| QWidget * | childAt (int x, int y) const |
| QWidget * | childAt (const QPoint &p) const |
| QRect | childrenRect () const |
| QRegion | childrenRegion () const |
| void | clearFocus () |
| void | clearMask () |
| bool | close (bool alsoDelete) |
| bool | close () |
| QColorGroup | colorGroup () const |
| void | constPolish () const |
| QMargins | contentsMargins () const |
| QRect | contentsRect () const |
| Qt::ContextMenuPolicy | contextMenuPolicy () const |
| QCursor | cursor () const |
| void | customContextMenuRequested (const QPoint &pos) |
| void | drawText (const QPoint &p, const QString &s) |
| void | drawText (int x, int y, const QString &s) |
| WId | effectiveWinId () const |
| void | ensurePolished () const |
| void | erase () |
| void | erase (const QRect &rect) |
| void | erase (const QRegion &rgn) |
| void | erase (int x, int y, int w, int h) |
| Qt::FocusPolicy | focusPolicy () const |
| QWidget * | focusProxy () const |
| QWidget * | focusWidget () const |
| const QFont & | font () const |
| QFontInfo | fontInfo () const |
| QFontMetrics | fontMetrics () const |
| QPalette::ColorRole | foregroundRole () const |
| QRect | frameGeometry () const |
| QSize | frameSize () const |
| const QRect & | geometry () const |
| void | getContentsMargins (int *left, int *top, int *right, int *bottom) const |
| virtual HDC | getDC () const |
| void | grabGesture (Qt::GestureType gesture, QFlags< Qt::GestureFlag > flags) |
| void | grabKeyboard () |
| void | grabMouse () |
| void | grabMouse (const QCursor &cursor) |
| int | grabShortcut (const QKeySequence &key, Qt::ShortcutContext context) |
| QGraphicsEffect * | graphicsEffect () const |
| QGraphicsProxyWidget * | graphicsProxyWidget () const |
| bool | hasEditFocus () const |
| bool | hasFocus () const |
| bool | hasMouse () const |
| bool | hasMouseTracking () const |
| int | height () const |
| virtual int | heightForWidth (int w) const |
| void | hide () |
| const QPixmap * | icon () const |
| void | iconify () |
| QString | iconText () const |
| QInputContext * | inputContext () |
| Qt::InputMethodHints | inputMethodHints () const |
| void | insertAction (QAction *before, QAction *action) |
| void | insertActions (QAction *before, QList< QAction * > actions) |
| bool | isActiveWindow () const |
| bool | isAncestorOf (const QWidget *child) const |
| bool | isDesktop () const |
| bool | isDialog () const |
| bool | isEnabled () const |
| bool | isEnabledTo (QWidget *ancestor) const |
| bool | isEnabledToTLW () const |
| bool | isFullScreen () const |
| bool | isHidden () const |
| bool | isInputMethodEnabled () const |
| bool | isMaximized () const |
| bool | isMinimized () const |
| bool | isModal () const |
| bool | isPopup () const |
| bool | isShown () const |
| bool | isTopLevel () const |
| bool | isUpdatesEnabled () const |
| bool | isVisible () const |
| bool | isVisibleTo (QWidget *ancestor) const |
| bool | isVisibleToTLW () const |
| bool | isWindow () const |
| bool | isWindowModified () const |
| QLayout * | layout () const |
| Qt::LayoutDirection | layoutDirection () const |
| QLocale | locale () const |
| void | lower () |
| Qt::HANDLE | macCGHandle () const |
| Qt::HANDLE | macQDHandle () const |
| QPoint | mapFrom (QWidget *parent, const QPoint &pos) const |
| QPoint | mapFromGlobal (const QPoint &pos) const |
| QPoint | mapFromParent (const QPoint &pos) const |
| QPoint | mapTo (QWidget *parent, const QPoint &pos) const |
| QPoint | mapToGlobal (const QPoint &pos) const |
| QPoint | mapToParent (const QPoint &pos) const |
| QRegion | mask () const |
| int | maximumHeight () const |
| QSize | maximumSize () const |
| int | maximumWidth () const |
| int | minimumHeight () const |
| QSize | minimumSize () const |
| int | minimumWidth () const |
| void | move (int x, int y) |
| void | move (const QPoint &) |
| QWidget * | nativeParentWidget () const |
| QWidget * | nextInFocusChain () const |
| QRect | normalGeometry () const |
| void | overrideWindowFlags (QFlags< Qt::WindowType > flags) |
| bool | ownCursor () const |
| bool | ownFont () const |
| bool | ownPalette () const |
| virtual QPaintEngine * | paintEngine () const |
| const QPalette & | palette () const |
| QWidget * | parentWidget (bool sameWindow) const |
| QWidget * | parentWidget () const |
| QPlatformWindow * | platformWindow () const |
| QPlatformWindowFormat | platformWindowFormat () const |
| void | polish () |
| QPoint | pos () const |
| QWidget * | previousInFocusChain () const |
| void | raise () |
| void | recreate (QWidget *parent, QFlags< Qt::WindowType > f, const QPoint &p, bool showIt) |
| QRect | rect () const |
| virtual void | releaseDC (HDC hdc) const |
| void | releaseKeyboard () |
| void | releaseMouse () |
| void | releaseShortcut (int id) |
| void | removeAction (QAction *action) |
| void | render (QPaintDevice *target, const QPoint &targetOffset, const QRegion &sourceRegion, QFlags< QWidget::RenderFlag > renderFlags) |
| void | render (QPainter *painter, const QPoint &targetOffset, const QRegion &sourceRegion, QFlags< QWidget::RenderFlag > renderFlags) |
| void | repaint (int x, int y, int w, int h, bool b) |
| void | repaint (const QRegion &rgn, bool b) |
| void | repaint () |
| void | repaint (int x, int y, int w, int h) |
| void | repaint (const QRegion &rgn) |
| void | repaint (bool b) |
| void | repaint (const QRect &rect) |
| void | repaint (const QRect &r, bool b) |
| void | reparent (QWidget *parent, QFlags< Qt::WindowType > f, const QPoint &p, bool showIt) |
| void | reparent (QWidget *parent, const QPoint &p, bool showIt) |
| void | resize (int w, int h) |
| void | resize (const QSize &) |
| bool | restoreGeometry (const QByteArray &geometry) |
| QByteArray | saveGeometry () const |
| void | scroll (int dx, int dy) |
| void | scroll (int dx, int dy, const QRect &r) |
| void | setAcceptDrops (bool on) |
| void | setAccessibleDescription (const QString &description) |
| void | setAccessibleName (const QString &name) |
| void | setActiveWindow () |
| void | setAttribute (Qt::WidgetAttribute attribute, bool on) |
| void | setAutoFillBackground (bool enabled) |
| void | setBackgroundColor (const QColor &color) |
| void | setBackgroundMode (Qt::BackgroundMode widgetBackground, Qt::BackgroundMode paletteBackground) |
| void | setBackgroundOrigin (BackgroundOrigin background) |
| void | setBackgroundPixmap (const QPixmap &pixmap) |
| void | setBackgroundRole (QPalette::ColorRole role) |
| void | setBaseSize (const QSize &) |
| void | setBaseSize (int basew, int baseh) |
| void | setCaption (const QString &c) |
| void | setContentsMargins (int left, int top, int right, int bottom) |
| void | setContentsMargins (const QMargins &margins) |
| void | setContextMenuPolicy (Qt::ContextMenuPolicy policy) |
| void | setCursor (const QCursor &) |
| void | setDisabled (bool disable) |
| void | setEditFocus (bool enable) |
| void | setEnabled (bool) |
| void | setEraseColor (const QColor &color) |
| void | setErasePixmap (const QPixmap &pixmap) |
| void | setFixedHeight (int h) |
| void | setFixedSize (const QSize &s) |
| void | setFixedSize (int w, int h) |
| void | setFixedWidth (int w) |
| void | setFocus (Qt::FocusReason reason) |
| void | setFocus () |
| void | setFocusPolicy (Qt::FocusPolicy policy) |
| void | setFocusProxy (QWidget *w) |
| void | setFont (const QFont &) |
| void | setFont (const QFont &f, bool b) |
| void | setForegroundRole (QPalette::ColorRole role) |
| void | setGeometry (int x, int y, int w, int h) |
| void | setGeometry (const QRect &) |
| void | setGraphicsEffect (QGraphicsEffect *effect) |
| void | setHidden (bool hidden) |
| void | setIcon (const QPixmap &i) |
| void | setIconText (const QString &it) |
| void | setInputContext (QInputContext *context) |
| void | setInputMethodEnabled (bool enabled) |
| void | setInputMethodHints (QFlags< Qt::InputMethodHint > hints) |
| void | setKeyCompression (bool b) |
| void | setLayout (QLayout *layout) |
| void | setLayoutDirection (Qt::LayoutDirection direction) |
| void | setLocale (const QLocale &locale) |
| void | setMask (const QBitmap &bitmap) |
| void | setMask (const QRegion ®ion) |
| void | setMaximumHeight (int maxh) |
| void | setMaximumSize (const QSize &) |
| void | setMaximumSize (int maxw, int maxh) |
| void | setMaximumWidth (int maxw) |
| void | setMinimumHeight (int minh) |
| void | setMinimumSize (int minw, int minh) |
| void | setMinimumSize (const QSize &) |
| void | setMinimumWidth (int minw) |
| void | setMouseTracking (bool enable) |
| void | setPalette (const QPalette &) |
| void | setPalette (const QPalette &p, bool b) |
| void | setPaletteBackgroundColor (const QColor &color) |
| void | setPaletteBackgroundPixmap (const QPixmap &pixmap) |
| void | setPaletteForegroundColor (const QColor &color) |
| void | setParent (QWidget *parent) |
| void | setParent (QWidget *parent, QFlags< Qt::WindowType > f) |
| void | setPlatformWindow (QPlatformWindow *window) |
| void | setPlatformWindowFormat (const QPlatformWindowFormat &format) |
| void | setShortcutAutoRepeat (int id, bool enable) |
| void | setShortcutEnabled (int id, bool enable) |
| void | setShown (bool shown) |
| void | setSizeIncrement (const QSize &) |
| void | setSizeIncrement (int w, int h) |
| void | setSizePolicy (QSizePolicy::Policy hor, QSizePolicy::Policy ver, bool hfw) |
| void | setSizePolicy (QSizePolicy::Policy horizontal, QSizePolicy::Policy vertical) |
| void | setSizePolicy (QSizePolicy) |
| void | setStatusTip (const QString &) |
| void | setStyle (QStyle *style) |
| QStyle * | setStyle (const QString &style) |
| void | setStyleSheet (const QString &styleSheet) |
| void | setToolTip (const QString &) |
| void | setUpdatesEnabled (bool enable) |
| void | setupUi (QWidget *widget) |
| virtual void | setVisible (bool visible) |
| void | setWhatsThis (const QString &) |
| void | setWindowFilePath (const QString &filePath) |
| void | setWindowFlags (QFlags< Qt::WindowType > type) |
| void | setWindowIcon (const QIcon &icon) |
| void | setWindowIconText (const QString &) |
| void | setWindowModality (Qt::WindowModality windowModality) |
| void | setWindowModified (bool) |
| void | setWindowOpacity (qreal level) |
| void | setWindowRole (const QString &role) |
| void | setWindowState (QFlags< Qt::WindowState > windowState) |
| void | setWindowSurface (QWindowSurface *surface) |
| void | setWindowTitle (const QString &) |
| void | show () |
| void | showFullScreen () |
| void | showMaximized () |
| void | showMinimized () |
| void | showNormal () |
| QSize | size () const |
| QSize | sizeIncrement () const |
| QSizePolicy | sizePolicy () const |
| void | stackUnder (QWidget *w) |
| QString | statusTip () const |
| QStyle * | style () const |
| QString | styleSheet () const |
| bool | testAttribute (Qt::WidgetAttribute attribute) const |
| QString | toolTip () const |
| QWidget * | topLevelWidget () const |
| bool | underMouse () const |
| void | ungrabGesture (Qt::GestureType gesture) |
| void | unsetCursor () |
| void | unsetFont () |
| void | unsetLayoutDirection () |
| void | unsetLocale () |
| void | unsetPalette () |
| void | update (const QRect &rect) |
| void | update (const QRegion &rgn) |
| void | update (int x, int y, int w, int h) |
| void | update () |
| void | updateGeometry () |
| bool | updatesEnabled () const |
| QRect | visibleRect () const |
| QRegion | visibleRegion () const |
| QString | whatsThis () const |
| int | width () const |
| QWidget * | window () const |
| QString | windowFilePath () const |
| Qt::WindowFlags | windowFlags () const |
| QIcon | windowIcon () const |
| QString | windowIconText () const |
| Qt::WindowModality | windowModality () const |
| qreal | windowOpacity () const |
| QString | windowRole () const |
| Qt::WindowStates | windowState () const |
| QWindowSurface * | windowSurface () const |
| QString | windowTitle () const |
| Qt::WindowType | windowType () const |
| WId | winId () const |
| int | x () const |
| const QX11Info & | x11Info () const |
| Qt::HANDLE | x11PictureHandle () const |
| int | y () const |
Public Member Functions inherited from QObject | |
| QObject (QObject *parent) | |
| QObject (QObject *parent, const char *name) | |
| virtual | ~QObject () |
| bool | blockSignals (bool block) |
| QObject * | child (const char *objName, const char *inheritsClass, bool recursiveSearch) const |
| const QObjectList & | children () const |
| const char * | className () const |
| bool | connect (const QObject *sender, const char *signal, const char *method, Qt::ConnectionType type) const |
| void | deleteLater () |
| void | destroyed (QObject *obj) |
| bool | disconnect (const QObject *receiver, const char *method) |
| bool | disconnect (const char *signal, const QObject *receiver, const char *method) |
| void | dumpObjectInfo () |
| void | dumpObjectTree () |
| QList< QByteArray > | dynamicPropertyNames () const |
| virtual bool | eventFilter (QObject *watched, QEvent *event) |
| T | findChild (const QString &name) const |
| QList< T > | findChildren (const QRegExp ®Exp) const |
| QList< T > | findChildren (const QString &name) const |
| bool | inherits (const char *className) const |
| void | insertChild (QObject *object) |
| void | installEventFilter (QObject *filterObj) |
| bool | isA (const char *className) const |
| bool | isWidgetType () const |
| void | killTimer (int id) |
| virtual const QMetaObject * | metaObject () const |
| void | moveToThread (QThread *targetThread) |
| const char * | name () const |
| const char * | name (const char *defaultName) const |
| QString | objectName () const |
| QObject * | parent () const |
| QVariant | property (const char *name) const |
| void | removeChild (QObject *object) |
| void | removeEventFilter (QObject *obj) |
| void | setName (const char *name) |
| void | setObjectName (const QString &name) |
| void | setParent (QObject *parent) |
| bool | setProperty (const char *name, const QVariant &value) |
| bool | signalsBlocked () const |
| int | startTimer (int interval) |
| QThread * | thread () const |
Public Member Functions inherited from QPaintDevice | |
| virtual | ~QPaintDevice () |
| int | colorCount () const |
| int | depth () const |
| int | height () const |
| int | heightMM () const |
| int | logicalDpiX () const |
| int | logicalDpiY () const |
| int | numColors () const |
| virtual QPaintEngine * | paintEngine () const =0 |
| bool | paintingActive () const |
| int | physicalDpiX () const |
| int | physicalDpiY () const |
| int | width () const |
| int | widthMM () const |
| int | x11Cells () const |
| Qt::HANDLE | x11Colormap () const |
| bool | x11DefaultColormap () const |
| bool | x11DefaultVisual () const |
| int | x11Depth () const |
| Display * | x11Display () const |
| int | x11Screen () const |
| void * | x11Visual () const |
Protected Member Functions | |
| void | resizeEvent (QResizeEvent *) |
Protected Member Functions inherited from QGraphicsView | |
| virtual void | contextMenuEvent (QContextMenuEvent *event) |
| virtual void | dragEnterEvent (QDragEnterEvent *event) |
| virtual void | dragLeaveEvent (QDragLeaveEvent *event) |
| virtual void | dragMoveEvent (QDragMoveEvent *event) |
| virtual void | drawBackground (QPainter *painter, const QRectF &rect) |
| virtual void | drawForeground (QPainter *painter, const QRectF &rect) |
| virtual void | drawItems (QPainter *painter, int numItems, QGraphicsItem *[] items, const QStyleOptionGraphicsItem[] options) |
| virtual void | dropEvent (QDropEvent *event) |
| virtual bool | event (QEvent *event) |
| virtual void | focusInEvent (QFocusEvent *event) |
| virtual bool | focusNextPrevChild (bool next) |
| virtual void | focusOutEvent (QFocusEvent *event) |
| virtual void | inputMethodEvent (QInputMethodEvent *event) |
| virtual void | keyPressEvent (QKeyEvent *event) |
| virtual void | keyReleaseEvent (QKeyEvent *event) |
| virtual void | mouseDoubleClickEvent (QMouseEvent *event) |
| virtual void | mouseMoveEvent (QMouseEvent *event) |
| virtual void | mousePressEvent (QMouseEvent *event) |
| virtual void | mouseReleaseEvent (QMouseEvent *event) |
| virtual void | paintEvent (QPaintEvent *event) |
| virtual void | scrollContentsBy (int dx, int dy) |
| void | setupViewport (QWidget *widget) |
| virtual void | showEvent (QShowEvent *event) |
| virtual bool | viewportEvent (QEvent *event) |
| virtual void | wheelEvent (QWheelEvent *event) |
Protected Member Functions inherited from QAbstractScrollArea | |
| void | setupViewport (QWidget *viewport) |
| void | setViewportMargins (const QMargins &margins) |
| void | setViewportMargins (int left, int top, int right, int bottom) |
Protected Member Functions inherited from QFrame | |
| virtual void | changeEvent (QEvent *ev) |
Protected Member Functions inherited from QWidget | |
| virtual void | actionEvent (QActionEvent *event) |
| virtual void | closeEvent (QCloseEvent *event) |
| void | create (WId window, bool initializeWindow, bool destroyOldWindow) |
| void | destroy (bool destroyWindow, bool destroySubWindows) |
| virtual void | enterEvent (QEvent *event) |
| bool | focusNextChild () |
| bool | focusPreviousChild () |
| virtual void | hideEvent (QHideEvent *event) |
| virtual void | languageChange () |
| virtual void | leaveEvent (QEvent *event) |
| virtual bool | macEvent (EventHandlerCallRef caller, EventRef event) |
| virtual int | metric (PaintDeviceMetric m) const |
| virtual void | moveEvent (QMoveEvent *event) |
| virtual bool | qwsEvent (QWSEvent *event) |
| void | resetInputContext () |
| virtual void | tabletEvent (QTabletEvent *event) |
| void | updateMicroFocus () |
| virtual bool | winEvent (MSG *message, long *result) |
| virtual bool | x11Event (XEvent *event) |
Protected Member Functions inherited from QObject | |
| bool | checkConnectArgs (const char *signal, const QObject *object, const char *method) |
| virtual void | childEvent (QChildEvent *event) |
| virtual void | connectNotify (const char *signal) |
| virtual void | customEvent (QEvent *event) |
| virtual void | disconnectNotify (const char *signal) |
| int | receivers (const char *signal) const |
| QObject * | sender () const |
| int | senderSignalIndex () const |
| virtual void | timerEvent (QTimerEvent *event) |
Protected Member Functions inherited from QPaintDevice | |
| QPaintDevice () | |
Additional Inherited Members | |
Static Public Member Functions inherited from QWidget | |
| QWidget * | find (WId id) |
| QWidget * | keyboardGrabber () |
| QWidget * | mouseGrabber () |
| void | setTabOrder (QWidget *first, QWidget *second) |
| QWidgetMapper * | wmapper () |
Static Public Member Functions inherited from QObject | |
| bool | connect (const QObject *sender, const char *signal, const QObject *receiver, const char *method, Qt::ConnectionType type) |
| bool | connect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method, Qt::ConnectionType type) |
| bool | disconnect (const QObject *sender, const char *signal, const QObject *receiver, const char *method) |
| bool | disconnect (const QObject *sender, const QMetaMethod &signal, const QObject *receiver, const QMetaMethod &method) |
| QString | tr (const char *sourceText, const char *disambiguation, int n) |
| QString | trUtf8 (const char *sourceText, const char *disambiguation, int n) |
Static Public Member Functions inherited from QPaintDevice | |
| int | x11AppCells (int screen) |
| Qt::HANDLE | x11AppColormap (int screen) |
| bool | x11AppDefaultColormap (int screen) |
| bool | x11AppDefaultVisual (int screen) |
| int | x11AppDepth (int screen) |
| Display * | x11AppDisplay () |
| int | x11AppDpiX (int screen) |
| int | x11AppDpiY (int screen) |
| Qt::HANDLE | x11AppRootWindow (int screen) |
| int | x11AppScreen () |
| void * | x11AppVisual (int screen) |
| void | x11SetAppDpiX (int dpi, int screen) |
| void | x11SetAppDpiY (int dpi, int screen) |
Public Attributes inherited from QGraphicsView | |
| typedef | CacheMode |
| typedef | OptimizationFlags |
Public Attributes inherited from QWidget | |
| typedef | RenderFlags |
Static Protected Member Functions inherited from QObject | |
| QByteArray | normalizeSignalSlot (const char *signalSlot) |
Detailed Description
The GraphicsView class provides a model/view implementation of a gantt chart.
Definition at line 44 of file kdganttgraphicsview.h.
Constructor & Destructor Documentation
|
explicit |
void GraphicsView::activated( const QModelIndex & index )
void GraphicsView::clicked( const QModelIndex & index );
void GraphicsView::doubleClicked( const QModelIndex & index );
void GraphicsView::entered( const QModelIndex & index );
void GraphicsView::pressed( const QModelIndex & index );
void GraphicsView::headerContextMenuRequested( const QPoint& pt ) This signal is emitted when the header has contextMenuPolicy Qt::CustomContextMenu and the widget wants to show a contextmenu for the header. Unlike in QWidget::customContextMenuRequested() signal, pt is here in global coordinates.
Constructor. Creates a new KDGantt::GraphicsView with parent parent.
Definition at line 304 of file kdganttgraphicsview.cpp.
|
virtual |
Destroys this view.
Definition at line 336 of file kdganttgraphicsview.cpp.
Member Function Documentation
|
signal |
|
virtual |
Adds a constraint from from to to. modifiers are the keyboard modifiers pressed by the user when the action is invoked.
Override this to control how contraints are added. The default implementation adds a soft constraint unless the Shift key is pressed, in that case it adds a hard constraint. If a constraint is already present, it is removed and nothing is added.
Definition at line 552 of file kdganttgraphicsview.cpp.
| void GraphicsView::clearItems | ( | ) |
Definition at line 607 of file kdganttgraphicsview.cpp.
|
signal |
| ConstraintModel * GraphicsView::constraintModel | ( | ) | const |
- Returns
- the KDGantt::ConstraintModel displayed by this view.
Definition at line 413 of file kdganttgraphicsview.cpp.
| void GraphicsView::deleteSubtree | ( | const QModelIndex & | idx | ) |
Definition at line 673 of file kdganttgraphicsview.cpp.
|
signal |
|
signal |
| AbstractGrid * GraphicsView::grid | ( | ) | const |
- Returns
- the AbstractGrid used by this view.
Definition at line 503 of file kdganttgraphicsview.cpp.
| Qt::ContextMenuPolicy GraphicsView::headerContextMenuPolicy | ( | ) | const |
- Returns
- the context menu policy for the header
Definition at line 539 of file kdganttgraphicsview.cpp.
|
signal |
| QModelIndex GraphicsView::indexAt | ( | const QPoint & | pos | ) | const |
- Returns
- The QModelIndex for the item located at position pos in the view or an invalid index if no item was present at that position.
This is useful for for example contextmenus.
Definition at line 596 of file kdganttgraphicsview.cpp.
| bool GraphicsView::isReadOnly | ( | ) | const |
- Returns
- true iff the view is in read-only mode
Definition at line 518 of file kdganttgraphicsview.cpp.
| ItemDelegate * GraphicsView::itemDelegate | ( | ) | const |
- Returns
- the ItemDelegate used by this view to render items
Definition at line 465 of file kdganttgraphicsview.cpp.
| QAbstractItemModel * GraphicsView::model | ( | ) | const |
- Returns
- the current model displayed by this view
Definition at line 370 of file kdganttgraphicsview.cpp.
|
signal |
| void GraphicsView::print | ( | QPrinter * | printer, |
| bool | drawRowLabels = true |
||
| ) |
Print the Gantt chart using printer. If drawRowLabels is true (the default), each row will have it's label printed on the left side.
This version of print() will print multiple pages.
Definition at line 684 of file kdganttgraphicsview.cpp.
| void GraphicsView::print | ( | QPrinter * | printer, |
| qreal | start, | ||
| qreal | end, | ||
| bool | drawRowLabels = true |
||
| ) |
Print part of the Gantt chart from start to end using printer. If drawRowLabels is true (the default), each row will have it's label printed on the left side.
This version of print() will print multiple pages.
To print a certain range of a chart with a DateTimeGrid, use qreal DateTimeGrid::mapFromDateTime( const QDateTime& dt) const to figure out the values for start and end.
Definition at line 699 of file kdganttgraphicsview.cpp.
| void GraphicsView::print | ( | QPainter * | painter, |
| const QRectF & | targetRect = QRectF(), |
||
| bool | drawRowLabels = true |
||
| ) |
Render the GanttView inside the rectangle target using the painter painter. If drawRowLabels is true (the default), each row will have it's label printed on the left side.
Definition at line 708 of file kdganttgraphicsview.cpp.
| void GraphicsView::print | ( | QPainter * | painter, |
| qreal | start, | ||
| qreal | end, | ||
| const QRectF & | targetRect = QRectF(), |
||
| bool | drawRowLabels = true |
||
| ) |
Render the GanttView inside the rectangle target using the painter painter. If drawRowLabels is true (the default), each row will have it's label printed on the left side.
To print a certain range of a chart with a DateTimeGrid, use qreal DateTimeGrid::mapFromDateTime( const QDateTime& dt) const to figure out the values for start and end.
Definition at line 721 of file kdganttgraphicsview.cpp.
|
protectedvirtual |
Reimplemented from QGraphicsView.
Definition at line 564 of file kdganttgraphicsview.cpp.
| QModelIndex GraphicsView::rootIndex | ( | ) | const |
- Returns
- the rootindex for this view.
Definition at line 435 of file kdganttgraphicsview.cpp.
| AbstractRowController * GraphicsView::rowController | ( | ) | const |
- Returns
- the AbstractRowController for this view.
- See also
- setRowController
Definition at line 485 of file kdganttgraphicsview.cpp.
| QItemSelectionModel * GraphicsView::selectionModel | ( | ) | const |
- Returns
- the QItemSelectionModel used by this view
Definition at line 450 of file kdganttgraphicsview.cpp.
|
slot |
Sets the constraintmodel displayed by this view.
- See also
- KDGantt::ConstraintModel.
Definition at line 406 of file kdganttgraphicsview.cpp.
|
slot |
Sets the AbstractGrid for this view. The grid is an object that controls how QModelIndexes are mapped to and from the view and how the background and header is rendered.
- See also
- AbstractGrid and DateTimeGrid.
Definition at line 495 of file kdganttgraphicsview.cpp.
| void GraphicsView::setHeaderContextMenuPolicy | ( | Qt::ContextMenuPolicy | p | ) |
Sets the context menu policy for the header. The default value Qt::DefaultContextMenu results in a standard context menu on the header that allows the user to set the scale and zoom.
Setting this to Qt::CustomContextMenu will cause the signal headerContextMenuRequested(const QPoint& pt) to be emitted instead.
Definition at line 532 of file kdganttgraphicsview.cpp.
|
slot |
Sets the KDGantt::ItemDelegate used for rendering items on this view.
- See also
- ItemDelegate and QAbstractItemDelegate.
Definition at line 458 of file kdganttgraphicsview.cpp.
|
slot |
Sets the model to be displayed in this view to model. The view does not take ownership of the model.
To make a model work well with GraphicsView it must have a certain layout. Whether the model is flat or has a treestrucure is not important, as long as an AbstractRowController is provided that can navigate the model.
GraphicsView operates per row in the model. The data is always taken from the last item in the row. The ItemRoles used are Qt::DisplayRole and the roles defined in KDGantt::ItemDataRole.
Definition at line 356 of file kdganttgraphicsview.cpp.
|
slot |
Sets the view to read-only mode if to is true. The default is read/write if the model permits it.
Definition at line 511 of file kdganttgraphicsview.cpp.
|
slot |
Sets the root index of the model displayed by this view. Similar to QAbstractItemView::setRootIndex, default is QModelIndex().
Definition at line 428 of file kdganttgraphicsview.cpp.
|
slot |
Sets the AbstractRowController used by this view. The AbstractRowController deals with the height and position of each row and with which parts of the model are displayed.
- See also
- AbstractRowController
Definition at line 475 of file kdganttgraphicsview.cpp.
|
slot |
Sets the QItemSelectionModel used by this view to manage selections. Similar to QAbstractItemView::setSelectionModel
Definition at line 443 of file kdganttgraphicsview.cpp.
|
slot |
Definition at line 375 of file kdganttgraphicsview.cpp.
| QAbstractProxyModel * GraphicsView::summaryHandlingModel | ( | ) | const |
- Returns
- the KDGantt::SummaryHandlingProxyModel used by this view.
Definition at line 420 of file kdganttgraphicsview.cpp.
| void GraphicsView::updateRow | ( | const QModelIndex & | idx | ) |
Definition at line 613 of file kdganttgraphicsview.cpp.
| void GraphicsView::updateScene | ( | ) |
Resets the state of the view.
Definition at line 651 of file kdganttgraphicsview.cpp.
|
slot |
Adjusts the bounding rectangle of the scene.
Definition at line 621 of file kdganttgraphicsview.cpp.
Property Documentation
|
readwrite |
Definition at line 48 of file kdganttgraphicsview.h.
The documentation for this class was generated from the following files:
Documentation copyright © 1996-2020 The KDE developers.
Generated on Mon Jun 22 2020 13:31:29 by doxygen 1.8.7 written by Dimitri van Heesch, © 1997-2006
KDE's Doxygen guidelines are available online.
KDE API Reference
Public Member Functions inherited from